My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-26_PERMIT FILE - M2022042 (16)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022042
>
2022-09-26_PERMIT FILE - M2022042 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 8:42:00 PM
Creation date
9/26/2022 10:26:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022042
IBM Index Class Name
Permit File
Doc Date
9/26/2022
Doc Name Note
Exhibit L - Reclamation Costs
Doc Name
Application
From
Julie M. Mikulas -Martin Marietta Materials, Inc
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Windsor East Mine, Exhibit L—Reclamation Costs September 2022 <br /> RECLAMATION • <br /> During the life of mine, 150 acres will be disturbed by the mining activities and approximately 54.7 acres of that <br /> will be water surface once reclamation is completed leaving 95.6 acres to be topsoiled and seeded. This site will <br /> be mined and reclaimed concurrently to limit the number of times that overburden is handled. <br /> The spreadsheet below represents the estimated cost for the Division to reclaim the Windsor East Mine, based on <br /> the point in time in the mining schedule where reclamation cost will be the highest. This will occur when Cell A is <br /> lined, Cell C is mined out but not lined, Cell B has had the topsoil removed and Cell D is mined out. At this point <br /> there will be an estimated 117 acres of disturbance. <br /> COST PER #OF <br /> ITEM UNIT UNIT UNITS TOTAL COST <br /> Earthmoving and Revegetation <br /> Overburden Replacement Cubic Yard $1.75 489,000 $855,750.00 <br /> Topsoil Replacement Cubic Yard $1.75 68,600 $120,050.00 <br /> Disking or Scarifying Acre $28.50 96 $2,724.60 <br /> Grass Seed Mix Acre $40.00 96 $3,840.00 <br /> Drill Grass Seed Mix Acre $18.00 96 $1,728.00 <br /> Fertilizer Acre $30.00 96 $2,880.00 <br /> Fertilizer Application Acre $12.50 96 $1,200.00 <br /> Dewatering Lump Sum $10,000.00 1 $10,000.00 <br /> Liner Installation Cell C <br /> Mob, Bonding, and Ins Lump Sum $150,000.00 1 $150,000.00 <br /> Backfill 200-400' along river Cubic Yard $2.20 115,000 $253,000.00 <br /> Foundation Excavation Cubic Yard $3.50 18,000 $63,000.00 <br /> Slope Liner Embankment Cubic Yard $2.20 90,000 $198,000.00 <br /> Reservoir Bottom Grading Lump Sum $40,000.00 1 $40,000.00 <br /> TOTAL DIRECT RECLAMATION COSTS $1,702,172.60 <br /> Overhead& Profit <br /> Public Liability Insurance 0.0155 $26,383.68 <br /> Contractor Performance Bond 0.0155 $26,383.68 <br /> Contractor Profit 0.1000 $170,217.26 <br /> DRMS Project Administration Expense 0.0500 $85,108.63 <br /> TOTAL INDIRECT RECLAMATION COST $308,093.24 <br /> TOTAL PERFORMANCE BOND AMOUNT $2,010,266 <br /> OTETRA TECH P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.