Laserfiche WebLink
Windsor East Mine, Exhibit G – Water Information September 2022 <br /> Page 11 | 11 <br />Long-term mitigation measures may include, but are not limited to: <br /> Cleaning a well to improve efficiency <br /> Providing an alternative source of water or purchasing additional water to support historic well use with <br />respect to water quantity and quality. If needed, water quality parameters will be checked in affected <br />wells to ensure alternative sources support the historic use <br /> Modifying a well to operate under lower groundwater conditions. This could include deepening existing <br />wells or lowering the pumps. All work would be done at Martin Marietta’s expense except for replacing <br />equipment that was non-functional prior to mining. <br /> If existing wells cannot be retrofitted or repaired: replace the impacted well with a new replacement well. <br /> Design and installation of a cistern <br />If a groundwater mitigation action is required, Martin Marietta will notify the DRMS of the condition, action taken <br />and report the results and present a plan for monitoring the mitigation. <br />