My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-23_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2022-09-23_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:27:00 PM
Creation date
9/23/2022 1:24:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/23/2022
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company L.P.
Type & Sequence
TR155
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Reclaim Upper and Lower Section 3 Ponds <br /> Site: Colowyo Coal Mine Permit Action: TR155 Permit/Job#: C1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 9/23/2022 County: Moffat Filename: C019-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Regrade Upper Section 3 Pond DOZER 1 55.60 $19,363 <br /> 002 Regrade Lower Section 3 Pond DOZER 1 67.40 $23,473 <br /> 003 Regrade Topsoil for Upper and Lower Section 3 DOZER 1 26.08 $9,084 <br /> Pond Dist. <br /> 004 Reseed Upper and Lower Section 3 Pond REVEGE 1 13.00 $15,006 <br /> Disturbance <br /> 005 Pump Upper/Lower Section 3 Ponds Prior to Two PUMPING 1 12.90 $798 <br /> Cleanings <br /> 006 Clean Upper/Lower Section 3 Ponds Two Times TRUCKI 1 21.95 $9,017 <br /> SUBTOTALS: 196.93 $76,741 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $1,550 <br /> Performance bond: 1.05 Total= $806 <br /> Job superintendent: 98.47 Total= $7,398 <br /> Profit: 10.00 Total= $7,674 <br /> TOTAL O&P= $17,428 <br /> CONTRACT AMOUNT(direct+O&P)= $94,169 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $1,883 <br /> Reclamation management and/or administration: 1.91 $1,799 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $21,110 <br /> TOTAL BOND AMOUNT(direct+indirect)= $97,851 <br />
The URL can be used to link to this page
Your browser does not support the video tag.