My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-23_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2022-09-23_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:27:00 PM
Creation date
9/23/2022 1:24:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
9/23/2022
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company L.P.
Type & Sequence
TR155
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#003 Page 2 of 2 <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.438 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.6445 <br /> Adjusted unit production: 801.24 LCY/hr <br /> Adjusted fleet production: 801.24 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.435/LCY <br /> Total job time: 26.08 Hours <br /> Total job cost: $9,084 <br />
The URL can be used to link to this page
Your browser does not support the video tag.