--------� 7 8
<br />■
<br />WCO28
<br />10
<br />MAP LEGEND
<br />18 LEFT VENTILATION SHAFT INSTALLATION
<br />TRANSFORMER
<br />PAD 2------------------ CUTTINGS TOPSOIL
<br />3
<br />PONDS PILE 13,550 CY
<br />DRI ILL P �D I -,
<br />SEDIMENT P ND _ 18 LEFT BOREHOLE
<br />WATERLINE
<br />12" HDPE PIPELINE
<br />SEEDED 2013
<br />7.5 ACRES
<br />TOP501 L
<br />-o PILE (2000 YD3) '
<br />G�
<br />�o
<br />G�
<br />I �
<br />�o
<br />ACCESS ROAD OFF P&K27
<br />FOCK CHECK
<br />CK CHECK
<br />18LT DEWATERING BOREHOLE
<br />RAW WATTLES
<br />SOIL PILE
<br />KOCKCHECK CKCHECK
<br />MANAGE DITCH
<br />STRAW WATTLES
<br />501 L PI LE
<br />WMD STABILIZATION BM_5tTtFeH
<br />2014
<br />(4.2 ACRES)
<br />DRAINAGE DITCH
<br />DRANAGE DITCH
<br />POCK CHECK
<br />SOIL PILE
<br />STFAW WATTLES
<br />WCK CHECK
<br />W WATTLES
<br />OIL PILE
<br />CK CHECK
<br />15 LE OF BH
<br />DRAIN
<br />2014
<br />AERIAL SPRAY AREA
<br />(280 ACRES
<br />ACCESS ROAD
<br />2014
<br />AERIAL SPRAY AREA
<br />10,000PIL STOCKPILES (340 ACRES) ROCK HECK /�'•�qq
<br />4 LEFT TUF M
<br />TLES
<br />DRANAGE CH STKAW WAT
<br />�I�
<br />SOIL PILE
<br />RO CHECK
<br />I G LT UTILITY BOREHOLE 2 6
<br />TUF HDPE LINE
<br />R
<br />R
<br />87
<br />86
<br />W
<br />W
<br />aPROPOSED
<br />WCO 14 10 RT DEWATERING
<br />PIPELINE
<br />.� 17
<br />G MAIN NORTH VENTILATION SHAFT INSTALLATION
<br />BULK MATERIAL ROCKDUST BOREHOLE RDBH
<br />BOREHOLE BMBH WATER BOREHOLE WBH
<br />1 AIR BOREHOLE ABH PROPOSED
<br />G MAIN NORTH DIVERSION DITCH 19 RT MINE DEWATERING
<br />PERMIT BOUNDARY SHAFTTTION\ POWERLINE
<br />S _ATION M N p p
<br />-- �20D14 (OT7 CR1 S) 5 MAIN NORTH
<br />CEMENT BOREHOLE
<br />PAssiverKFArMENr ACCESS DIVERSI DITCH I O' CMP RISER
<br />1 ^ SYSTEM PROJEC ROAD
<br />,` ,-v -_— - /ACCESS ROAD
<br />yV� v` 5 MN CEMENT
<br />O ,� WCO 13 = BOREHOLE PAD
<br />i OP501L STOCKPILE, BOREHOLE
<br />a 60500YD3TOCKPILE 10, CNii' , SERA �^ `.C�1� 1 0500YD3TOCKPI
<br />% 1 OSER P =?�� .
<br />PUMP STA N 5 NM VENT SHAFT
<br />POWERLINE
<br />STOCK ON �\ ACCESS PAD SHAFT LOCATION
<br />I ,800' 10" AND LIGHT LOCATION OF
<br />HDPE PIPELINE USE ROAD -,l /FAN SILENCE
<br />GMN STORAGE RESERVOIR
<br />WATERLI N E
<br />5EEDED 2012
<br />7.1 ALMS
<br />GMN STORAGE RESERVOIR WATERLINE TO} S IL STOCKPILES
<br />50FT PIPELINE DISTURBANCE CORRIDOR 0 CY (PAD) \�
<br />13 LEFT UTILITY BOREHOLE/i' l�
<br />UPGRADE EXISTING CMP PIPE, `
<br />FROM 16" TO 24" DIAMETER (� `
<br />- 100' IN LENGTH
<br />TOPSOIL STOCKPILE
<br />RUNOFF DIVERSION ACCESS ROAD
<br />P DITCH WITH ROCK LENGTH = 2550'
<br />e CHECK DAMS 13 LEFT UTILITY BH
<br />° I ACRE PAD SURFACE
<br />N:44105.22
<br />E: 20343.03
<br />2 SURFACE ELEV. G744'
<br />4 FLOOR ELEV. 5477'
<br />BH DEPTH = 1 257'
<br />'It. o
<br />20
<br />15 LT BOREHOLE / VENTILATION SHAFT
<br />TOPSOIL STOCKPILE
<br />5,000 CY
<br />FISH CREEK DEWATERING BO O
<br />BARRICADE CHAMBER
<br />TRANSFORMER (7 NORTH ESCAPE SHAFT )
<br />TOPSOIL STOCKPILE
<br />TOPSOIL STOCKPILE
<br />150 YD3 FC13-3 2,200 YD3
<br />TOPSOIL STOCKPILE
<br />350 YD3 FCB-2 0
<br />BARRICADE ACCESS SHAFT
<br />--- 0.5 ACRES
<br />DEWATERING BOREH L °
<br />TOPSOIL STOCKPILE FISH CREEK WATER TREATMENT FACILITY _ — ELECTRICAL BOREHOLE (PLUGGED
<br />7,400 YD3 FC13-1 _ -
<br />TOPSOILSTOCKPILE SEEDED 2000
<br />TOP 01LYD3 FCVPK 0. 1 ACRE MINE WATER RETURN LINE SUBSTATION
<br />SEEDED TURN ELECTRICAL BOREHOLE TOPSOIL STOCKPILE
<br />FISH CREEK SETTLING PONDS 7.0 ACRES I , 100 YD3 SSS- I
<br />TOPSOIL STOCKPILE
<br />000 YD3 555-1
<br />25
<br />7740
<br />12 LEFT TUF HDPE LINE
<br />P/ de
<br />0
<br />EEDE 1990 EXIS RANCH ROAD
<br />1.2 ACRES
<br />SOUTHWEST VE ILATION 51
<br />� v
<br />— ----------PERMITBOUNDARY-----------------
<br />35
<br />1�
<br />8
<br />12
<br />10 RT MINE DEWATERING
<br />BOREHOLE
<br />PROPOSED BOREHOLE
<br />LOCATION
<br />■
<br />WCO 1G
<br />■
<br />WCO17
<br />•
<br />W 015
<br />10 EAST UTILITY BH
<br />TOPSOIL 5TC CKPILE
<br />STRAW WATT ES /
<br />ROCK CHEC
<br />7 EAST CROSS ENTRY BOREHOLE
<br />TOP SOIL
<br />1�10
<br />(V\/C018
<br />WCO 18R
<br />UND15TURMD ACCESS
<br />ALONG A RIDGE
<br />--- WCO20
<br />TOP5I
<br />1,100 D3(RO D) MATCH LINE SHEET 2 OF 2
<br />I , 100 YD3 (ROAD) `�F
<br />ACCESS ROAD TO 5MN MATCH LINE SHEET I OF 2 WCO2GF
<br />AND GMN SHAFT SITES
<br />` EXISTING WCO GE
<br />NMD POWER BOREHOLE RANCH ROAD
<br />TOPSOIL STOCKPILE WCO2GB CO2G
<br />2,900 CY (PAD) ACCESS ROADS
<br />WC000
<br />WCO 12 10 RT DEWATERING BOREHOLE INSTALLATION
<br />•
<br />TOPSOIL STOCKPIL TOPSOIL STOCKPILE
<br />2,800 YD3 (ROAD) 7,450 CY
<br />10 RT DEWATERING 21
<br />WATERLINE
<br />ACCESS ROAD ACCESS ROAD G RT THICKENER UND RFLOW
<br />(PRE-EXISTING (PRE-EXISTING BOREHOLE
<br />RANCH ROAD) RANCH ROAD) LIGHT US
<br />TROUT CREEK SANDSTONE ROAD
<br />ACCESS ROAD
<br />WC01 I I • I
<br />ACCESS ROAD
<br />(PRE-EXISTING
<br />RANCH ROAD)
<br />TEST SITE soo
<br />z000
<br />RECLAIMED DRILL PAD
<br />SEEDED 1900
<br />1.2 ACRES
<br />BOREHOLE
<br />PAD
<br />2 9 POND G DITCH EXTENSION 28
<br />3 O 0.3 ACRES
<br />TOPSOIL STOCKPILE
<br />G RT PIPELINE
<br />DISTURBANCE
<br />2012 ( 5.5 ACRES )
<br />FOIDEL SCHOOL MINE ENTRANCE
<br />OUT BUILDING
<br />G
<br />EXISTING PANC" P.OAL
<br />ROCK DUST TANK
<br />RDT- I
<br />800 CY O T OP8 001 L STOCKPILE
<br />�3 = TOPSOIL STOCKPILE
<br />"�"EOLOGYIXIFFFP.-4.sAc�
<br />Kc"E°K PROTECTIVE B
<br />SEEDED 1005
<br />—zs0' DR^JNACE Dlrcn
<br />—szs STPAW 11ATTL15
<br />2930'
<br />TUF "D 0 LINE i
<br />�r� ""W C �.T'RP,Ii_EF� ��I IIIIIIjIIII�IIIIII ACCESS / HAULROAD __0
<br />I, ,�,xl„I,II;I;' ----- fir'+�tr�+�+!��
<br />SEEDED 1995 4 � --�I II II II IIII IIII I
<br />� + �PKIIF
<br />OFOF�III�Jr�>�r` I II I II I I I I I II I II III,
<br />TWENTYMILE SANDSTONE CLIFF MITIGATION h I I I IIIIII IIII I II II
<br />27.3ACRES TOP5DR �w +Irl: � SIG ��',, II�III�II�I�III�IIII�II�II II
<br />IIII IIII III I III
<br />00 C01LSSTOCKPILE RAI ROAD ; !��y_. ��illl�
<br />P � ��,. ,,. , ,,. ,��� I,IililrI I I +I;�I;
<br />31 EXISTING SANDSTONE SUB PAD TIE-IN LOCATION ���IIIIIII I1�1 Ir�I Il�lbliiijllllllll IIII IIIIIII IIII IllllljIIOFFICE ILER
<br />-- �/ �,� � I I I I I I d I � �I I I I I I I II I I I I II I I I I + .I,li,
<br />III,JI II II II II
<br />TRANSFORMER , _�; ,illllillililllllllillllilllllllillllllllllll�IIIIIII�IIIIiI!i� �
<br />BOREHOLE % _r r /) kI> III (Jr.I II IIIIIII II II I I I IIII I II I I IIII OFFICE BATHHOUSE
<br />\ PROTECTIVE BERM _ f �+¢IjLIIIIIIII I�IIIIIIIIIIIIIIIIIII I IIIIIIIII IIII
<br />SEED D 1005 �� I II'I'Illjllhr(JIII�tljl�hhPllllll IIIIII II
<br />„(o.3Ac,� Ili'illil�Ililillillilill�i++IIIlillih
<br />700 CY SF -5 --- ,i /�/ , T I�IIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIjIIj�(Jf�J�l�l TOPSOIL STOCKPILE
<br />-r� /�/I��IIIIIIII�IIIIIIIIIIII�IIII II�I�I� FAN 55,850 CY 5F-2
<br />MINE ENTRANCE PORTAL
<br />SOIL STOCKPILE 30 FT HIGH
<br />�-4.5 ACRES - 200,000 CY
<br />rr + �(� TEMPORARY CUTTINGS STORAGE AREA
<br />.4 i.�_I "Ji�'I as,�
<br />TOPSOIL STOCKPILE f;, "- F raag` CRDA FI T BENCH 32 33 000 CY S F-1 7
<br />�1I'T'I" P501L 2014 ( 0 ACRES )
<br />I 1 '000 CY COAL REFUSE DISPOSAL
<br />RAMP �Il�li {I+I OVER NW SLOPE C AREA EXPANSION
<br />TOPSOIL STOCKPILE III I� II I II 5 000 CY 2012(4.7
<br />7 4, 100 CY SF-8 _ Illi l�fhlII BUILD TO SOIL STOCKPILE
<br />)
<br />151,200 CY SF-G TOPSOIL STOCKPILE
<br />W ,100,700 CY 5F-3
<br />BELT OU COL WASTE DISPOSAL SITE
<br />(BOB)
<br />j TOPSOIL 5 SKPILE COVER MATERIAL
<br />38,700 SF-7 (9STOCKPILE (CRDA-C2 )
<br />123,800 CY
<br />f EXPLOSIVES BUNKER LOCATION
<br />' \ T SOIL STOCKPILE
<br />3 1 ,800 CY (CRDA S2 )
<br />TOPSOIL STOCKPILE -— N
<br />5,800 CY 5F-9 I T
<br />TOPSOIL STOCKPILE ` _
<br />1 350 CY SF-10 �`
<br />1 -N
<br />ACCESS ROAD / �7J \ TOPSOIL STOCKPILE
<br />1 / / COVER MATERIAL 20,000 CY
<br />STOCKPILE
<br />70,000 CY ( CRDA-C I )
<br />° TOPSOIL STOCKPILE
<br />POND A 1 4,000 CY ( CRDA 51 )
<br />1
<br />----------------------------------------------------- ----------------------------------
<br />8 PERMIT BOUNDARY 9
<br />7
<br />i
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />EXISTING
<br />RANCH ROAD
<br />CORD.#33
<br />a Q
<br />0
<br />WCO22
<br />vvCO I a
<br />WCO IOR
<br />■
<br />WCO27
<br />■
<br />WCO2GG
<br />°0 ❑
<br />=o 0
<br />27
<br />PERMIT BOUNDARY
<br />1 ME
<br />■
<br />0
<br />FEV15ION
<br />DATE
<br />BY
<br />DRAWN BY
<br />MR 1 7-307
<br />04/ 14/ 1 7
<br />KEC
<br />BY
<br />DATE
<br />TR 1 7-86
<br />OG/ 1 3/ 1 7
<br />KEC
<br />KEC
<br />1 /7/98
<br />TR 1 8-02
<br />0012G/ 18
<br />KEC
<br />SCALE: I 11= 800'
<br />TR I G-64
<br />12/18/18
<br />KEC
<br />MRI 9-3 14
<br />07- 1 G- I S
<br />MILK
<br />MR20-3 I G
<br />0 1 -OG-2C
<br />MLK
<br />TOWNSHIP
<br />TR2 1 -07
<br />9-02-2 1
<br />MILK
<br />T 5 N
<br />RANGE
<br />R 8G W
<br />I, MIRANDA LYNN KAWCAK, A REGISTERED PROFESSIONAL
<br />ENGINEER IN THE STATE OF COLORADO DO HEREBY CERTIFY THAT TH15
<br />MAP 15 CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.
<br />MIRANDA LYN N KAWCAK DATE
<br />P.E. NO. 59419
<br />LEGEND
<br />AREAS WHICH TCC 15 RESPONSIBLE FOR
<br />FINAL RECLAMATION
<br />AREAS WHICH RAILROAD 15 RESPONSIBLE FOR
<br />FINAL RECLAMATION
<br />AREAS WHERE VARIANCE FROM CONTEMPORANEOUS
<br />RECLAMATION HAS BEEN APPROVED FOR COMBINED
<br />SURFACE AND UNDERGROUND OPERATIONS
<br />( RULE 2.0G7) OR FACILITIES WERE TRANSFERRED
<br />UNDER NEW PERMIT.
<br />AREAS RECLAIMED
<br />- AREAS OF WEED CONTROL 2014
<br />( AL50 SEE LISTED AREAS )
<br />AREAS OF RECLAMATION 2014
<br />AREAS OF TEMPORARY SEEDING 2014
<br />STREAM BUFFER ZONE ( 1 001 )
<br />STREAM BUFFER ZONE VARIANCE
<br />• DRILL HOLE LOCATION
<br />WCO2G
<br />area of Interest
<br />5HEET 4
<br />AIIIIIIIIIIIIIILD A1111111111011L Twentymile Coal LLC
<br />it U
<br />29515 Routt Co. Rd. # 27
<br />Oak Creek, CO 81639
<br />FOIDEL CREEK MINE
<br />MAP 29
<br />RECLAMATION MAP
<br />Seam: Surface Country: USA
<br />Date: 10/08/14
<br />Drawn By: KEC State: Colorado
<br />SCALE: 1"= 800' o soo' 1600
<br />Printed By: 185 173
<br />Date : 5ep 09, 2021
<br />Time-: 4:43 PM
<br />1:\Environmental\REVI5I0N\TECH-RV\TR2 1 -97 7E Cross Entries Borehol6ACAD—G15�_pdf tmp.dwg