My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-06_PERMIT FILE - C1982056A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056
>
2021-08-06_PERMIT FILE - C1982056A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2022 12:09:45 PM
Creation date
9/21/2022 8:20:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
8/6/2021
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR21-319 2.05-84.15 07/27/21 <br />salvaged and placed in stockpile for future use in reclaiming the site. A temporary soil stockpile(s) will be established <br />on the northwest side of the pad area. The natural vegetative materials incorporated into the soil, and seeding with <br />the topsoil stockpile stabilization seed mixture, will stabilize and protect the stockpiled soil materials. Soil salvage <br />volumes are indicated on Table 49A. <br />9-East Utility Borehole Installation (MR16-296) - Light-use road and pad construction for the 9-East Utility <br />Borehole Installation will involve removal of any large vegetation and stripping and stockpiling of other vegetation, <br />soil, and organic materials. The road and pad are located on a low-gradient sidehill, with a pad area of approximately <br />2.1 acres, and a road corridor of approximately 1.6 acre. TC will recover and salvage up to 2 feet of soil from the <br />road and pad areas, resulting in recovery and stockpiling of a maximum volume of approximately 11,880 cubic yards <br />of soil material for future use in reclaiming the site. Note that, based on available soil mapping information and <br />descriptions, soil depths in the project area vary, but may be up to 38-inches in thickness. TC proposes to recover up <br />to 24-inches of soil, both in order to minimize site disturbance and because replacement of 24-inches of soil material <br />is more than adequate to support effective revegetation efforts in this area. Temporary soil stockpiles will be <br />established at reasonable intervals along the road and adjacent to the pad area. The natural vegetative materials <br />incorporated into the soil, and seeding with the topsoil stockpile stabilization seed mixture, will stabilize and protect <br />the stockpiled soil materials. Soil salvage volumes are indicated on Table 49A. <br /> <br /> <br />7 East Cross Entries Borehole (TR21-97) - Access road and pad constructions for the 7 East Cross entries borehole <br />will involve removing the vegetation and stripping and stockpiling the topsoil. The access road and the pad are located <br />on minimal sloping ground therefore very little earthwork will be required. The pad site will be approximately 300’ <br />X 300’ for an area of ~2 acres. The access road will only be 140 feet and 30 feet wide for a total area of disturbance <br />equal to 2.2 acres. TC will recover and salvage 12 inches of topsoil for an approximately volume of 3,485 cubic <br />yards. Soil salvage volumes are indicated on Table 49A. <br /> <br /> <br />18LT Dewatering Borehole (MR21-319) - Access road and pad constructions for the 18LT Dewatering borehole <br />will involve removing the vegetation and stripping and stockpiling the topsoil. The access road and the pad are located <br />on minimal sloping ground therefore minimal earthwork will be required. The pad site will be approximately 175’ <br />X 200’ for an area of ~1 acres. The access road will be 2,100 feet and 30 feet wide for disturbance equal to ~2 acres. <br />TC will recover and salvage 12 inches of topsoil for an approximately volume of 3,600 cubic yards. Soil salvage <br />volumes are indicated on Table 49A.
The URL can be used to link to this page
Your browser does not support the video tag.