Ground Water Ouantitv Protection <br />No registered wells are completed in the Trout Creek Sandstone in the central part of the Twentymile Park Basin <br />except those owned by TCC. There are also no registered wells completed in the Twentymile Sandstone in this part <br />of the Basin. Groundwater rights in the permit area and vicinity are shown in Table 9. <br />In the unlikely event that underground mining activities cause adverse quantitative injury to another water user, <br />TCC or a subsidiary would utilize their ground water rights within the general area to mitigate any such injury. <br />Know uses of ground water are identified and discussed under Rule 2.04,7(1)(a)(iii) starting on page 2.04-33. <br />div) The quality of surface and ground water affected by any underground mines by <br />locating mine openings in accordance with 4.05.10. <br />The mine portals are designed such that no gravity discharge of water from the mine occurs. Water from the <br />disturbed portal wedge area or rock slopes is routed to Pond E, or alternatively, it may be piped to Site 114. No <br />water will be discharged by gravity from the Fish Creek Borehole/Shaft. <br />The description shall include: <br />(i) A plan for control, in accordance with Rule 4, of surface ground water drainage <br />into, through and out of the proposed permit area and adiacent area: <br />Drainage Control and Treatment Plan <br />Previous operations plans for the Foidel Creek Mine created certain changes in the original sediment -control plan <br />implemented under the previously approved Permit No. 79-177. The most significant changes were a result of the <br />variance from contemporaneous reclamation requirements to allow a portion of the Area 1 surface mine pit to <br />remain open and to serve as a disposal site for waste rock material from the underground mine. <br />Exhibit 31, Spoil Analysis, contains recommendations for drainage control near the portal area. As stated, the crest <br />of the highwall is a topographic drainage divide, and surface drainage north of the crest drains away from the <br />highwall (into Ponds, D, E, F, and G, as shown on Map 24, Surface Facilities). This plan provides for drainage of <br />the area south of the surface facilities utilizing two diversion ditches. Ditch D-4 is located at the toe of the spoils <br />slope, and Ditch D-3 at the crest of the spoil slope, as shown on Map 24, Surface Facilities, and specified in Exhibit <br />8, Sediment Control Plan. Ditch D-3 is designed for the 100 -year, 24-hour precipitation event to provide a measure <br />of safety and stability to the spoil slopes. All other drainage control measures are designed for the 10 -year, 24-hour <br />event. The plan calls for the Area 1 Pit water to be allowed to overflow into Pond D, with discharge to Foidel <br />Creek, as shown on Map 24, Surface Facilities. Thus, all water from disturbed lands pass through sedimentation <br />ponds before being released to Foidel Creek, except for Small Area Exemptions. <br />TCC has assumed the operational and reclamation liability for ponds/treatment facility B, C, D, E, F, G, and T since <br />the completion of mining at Colorado Yampa Coal Company. Pond B, which is a treatment facility, receives wash - <br />down water and surface runoff from the tipple and Belt -Out -Back stockpile. Pond C controls runoff from the old <br />loadout stockpile and its associated pad. Pond D receives surface runoff, spoils discharge from the Area 1 Pit, and <br />mine water. Pond E receives runoff from the surface facilities, including surface water from the Wadge Sump. <br />Pond F receives runoff from the surface facilities, upland reclaimed area, and spoil water. Pond G receives runoff <br />from the surface facilities and upland reclaimed areas. Design details for these ponds are presented in Exhibit 8. <br />TCC also constructed the 6MN Mine Water Storage Reservoir to provide additional water storage capacity for the <br />operational mine water system. With a compacted clay liner with a permeability of approximately 2.0 x 10-' cm/in, <br />groundwater infiltration will be minimal, with minimal potential for impacts to groundwater or associated alluvial <br />surface water. <br />Additionally, TCC utilizes diversion ditches to route the 100 -year flow event around the refuse pile. The design of <br />the refuse pile diversion ditches is presented in Exhibit 26A, Appendix D. These diversions take upland flow and <br />divert it around the perimeter of the refuse pile in accordance with the DMG regulations. <br />TR07-61 2.05-130 09/26/07 <br />