Laserfiche WebLink
PR-02 1 09/21/20 <br />OPERATIONS AND RECLAMATION PLAN <br />HAYDEN GULCH LOADOUT FACILITY <br /> <br />TABLE OF CONTENTS <br />TAB1 TITLE VOLUME <br />____ _____ ______ <br /> 1 Hayden Gulch Loadout Permit Summary 1 <br /> 2 General Polices 1 <br /> 3 Adjudication File 1 <br /> 4 Land Use 1 <br /> 5 Cultural Resources 1 <br /> 6 Geology 1 <br /> 7 Hydrological Description 1 <br /> 8 Climatology 1 <br /> 9 Soil Resources 1 <br />10 Vegetation 1 <br />11 Fish and Wildlife Resources 1 <br />12 Facilities 2 <br />13 Hydrologic Monitoring Plan 2 <br />14 Protection of the Hydrologic Balance 2 <br />15 Probable Hydrologic Consequences 3 <br />16 Hydrologic Reclamation Plan 3 <br />17 Reclamation Schedule 3 <br />18 Backfilling and Grading 3 <br />19 Topsoil Handling Plan 3 <br />20 Revegetation Plan 3 <br />21 Fish and Wildlife Plan 3 <br />22 Air Quality Control Plan 3 <br />23 Bonding 3 <br />24 Signs and Markers 3 <br /> <br />__________________________________________________________________________________________ <br /> <br /> 1Note: Individual listings of Attachments and Appendices may be found in the Table of <br /> Contents for each Tab. <br />