Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br /> Trenching to obtain assay samples of waste rock material will be conducted on the flat <br /> tops of several waste rock piles at the Native Silver Mine. Access will be by existing <br /> be conducted by a rubber-tire backhoe or track-mounted excavator, depending on <br /> equipment availability. Up to 3bU' ot linear trenching will range trom o in ep . <br /> Trenches .,ill he hack-filled immcriiatcaly� after ganchPmical samples are collected from <br /> the excavated material. No trenches will remain open overnight. See Appendix A for <br /> images of the waste rock piles and access roads. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter,depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity Width (ft) Length (ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> Form 2-Public File Page 6 of 14 <br />