Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) <br /> condition: <br /> Access to the trench locations is via existing, passable roads on private GIR ownership <br /> with restHeted seeess. Due to the eermpeeted mature of these existing roads amd <br /> frequent usage by GIR, post-drilling reclamation efforts of any sort except for perhaps <br /> smoothing out existing erosional ruts would be futile. <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br /> seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br /> mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br /> land or State Land Board if on state land. <br /> A. Plant name and seeding rate: <br /> Plant Name Seeding Rate (PLS/Acre) <br /> Reseeding wasterock that is compacted and <br /> leached of organics is deemed impractical and <br /> will not be attempted <br /> Form 2—Public File Page 10 of 14 <br />