Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings, ponds, etc. <br /> Trenching to obtain assay samples of waste rock material will be conducted on the flat tops <br /> of several waste rock piles at the Isabel Mine. Access will be by existing private roads and <br /> . . a mately 360' long cross-country iraverse crossing Grand Island ResoUrces <br /> patented mining claims. Trenching will be conducted by a rubber-tire backhoe or <br /> track-mounted excavator, depending on equipment availability. Up to 200m of linear <br /> trenching will range from 10' to 20' in depth Trenches will be back-filled immediately after <br /> geochemical samples are collected from the excavated material. No trenches will remain <br /> open evemight. See Appendix A fOF images of the waste FeGk piles and aGGess roads. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter,depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity Width (ft) Length (ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type, quantity and general dimensions: <br /> Fornr 2-Public File Page 6 of 14 <br />