My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-15_PERMIT FILE - P2022016 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2022016
>
2022-09-15_PERMIT FILE - P2022016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 10:04:56 PM
Creation date
9/19/2022 8:37:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2022016
IBM Index Class Name
Permit File
Doc Date
9/15/2022
Doc Name
Notice Of Intent
From
Grand Island Resources LLC
To
DRMS
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Is the site of material extraction on public or privately owned property? <br /> Public ❑ Private ✓❑ <br /> 3. What type(s) of material or metal is/are proposed to be extracted and describe the <br /> physical nature of the site i.e., river terrace, rocky knob, in-stream gravel deposit, <br /> etc.? <br /> Historic waste rock piles will be sampled for geochemical analysis using trenches or pits. Trenches will not <br /> be dug into underlying bedrock,and trenches will be immediately backfilled. Samples of 2 kg will be <br /> depth. The site to be sampled would be barren of vegetation and generally topographically higher than the <br /> surrounding terrain. <br /> 4. What processing or extraction method(s) will be used on site? Include any <br /> equipment or chemical(s) that will be used in the processing and extraction of the <br /> materials. <br /> No processing of apy kind- Will b_Q_ done dupipg this progarn on-site or off <br /> Extr2dian well ant2il i lrae of 2n excavator (likely track mounted) and- the- 5_4-pot <br /> lifts will he pile) for composite sampling prior to backfilling <br /> 5. Will the extracted material be hauled offsite or used on the same parcel of <br /> property where the material is extracted? <br /> Only these small samples will be taken off-site for sample preparation and shipment to the lab <br /> 6. How will the extracted material be used on site? <br /> h-nckfilled to the trench after taking the final sample at the hadrock contact- <br /> 7. If the material is hauled offsite, where will it be hauled to and what it the intended <br /> use? <br /> Only these 2 kg samples of sach 5-foat well he taken off-sitia for <br /> laboratory analyses <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.