Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> There is no topsoil available for any stockpile and salvage on the waste rock piles and <br /> o add organics in the reclamation phase for such a small portion of the area disturbed <br /> by waste rock would likely be futile due to the compacted nature of the waste rock <br /> covering the surface. While GIR believes in adding value to a site post-usage, covering <br /> the area witl, topsoil would likely see it just erode away. Therefore ,to topsoil will be <br /> used for reclamation. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Trenches will be refilled immediately after samples are collected. <br /> Form 2—Public File Page 9 of 14 <br />