EXHIBIT L RECLAMATION COSTS <br /> 1 . Introduction <br /> This section details the cost of fully reclaiming the Mystic Soil site at the point in time where the <br /> most land is disturbed, and the resultant reclamation costs are the highest. This scenario would <br /> be at a point where one Pit and the Soil Storage Area would need to be reclaimed. <br /> Temporary facilities onsite to support mining activity, such as the fuel tanks, will all be removed <br /> during final reclamation. All of these facilities are portable. All equipment onsite is mobile. <br /> The permittee will not phase the bond. Bond tasks are described below and the bond cost is <br /> summarized in Table L-1. <br /> 1. Mobilize and demobilize equipment. <br /> 2. Remove of portable toilets. <br /> 3. Topsoil surfacing of 10 acres. A front end loader will load topsoil from a stockpile into a <br /> haul truck that drives an average of 1000 feet prior to dumping. A bulldozer will then <br /> spread topsoil to final thickness. <br /> 4. Topsoil preparation. Disking of soil with a tractor. <br /> 5. Rangeland seeding and mulching. Assuming a 50% failure rate. <br /> Mystic Soil <br /> November 2020 -1 Lewicki&Associates <br />