Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Replace Topsoil on D/E Pits <br /> Site: Trapper Mine Permit Action: RN8 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 091A State: Colorado Abbreviation: None <br /> Date: 9/1/2022 County: Moffat Filename: CO10-091A <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat DIOT- IOSU <br /> -Dump Area: Cat DIOT- IOSU <br /> Road Maintenance—Motor Grader: CAT 16M <br /> -Water Truck: Water Tanker,2,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 100 100 100 50 <br /> Ownership cost/hour: $287.19 NA $153.67 $153.67 $163.86 $10.28 <br /> Operating cost/hour: $277.83 NA $166.94 $166.94 $109.86 $10.16 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA $41.30 $41.30 $28.56 $21.12 <br /> Unit Subtotals: $595.92 NA $361.91 $361.91 $302.28 $41.56 <br /> Number of Units: 8 0 1 1 1 1 <br /> Group Subtotals: Work: $4,767.36 Support: $723.82 Maine $343.84 <br /> Total work team cost/hour: $5,835.02 <br /> MATERIAL QUANTITIES <br /> Initial volume: 488,686 CCY Swell factor: 1.215 <br /> Loose volume: 593,753 LCY <br /> Source of estimated volume: Appendix A,Table 1.4-9 <br /> Source of estimated swell factor: Cat Handbook <br />