My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-07_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2022-09-07_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2022 3:11:43 PM
Creation date
9/9/2022 6:28:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
9/7/2022
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining, Inc.
Type & Sequence
RN8
Annual Report Year
2022
Email Name
RAR
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> Task description: D/E Pit Regrade(Spoil Side East) <br /> Site: Trapper Mine Permit Action: RN8 Permit/Job#: C1981010 <br /> PROJECT IDENTIFICATION <br /> Task#: 004A State: Colorado Abbreviation: None <br /> Date: 9/1/2022 County: Moffat Filename: C010-004A <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat DIIT- IIU <br /> Horsepower: 850 <br /> Blade Type: Universal <br /> Attachment: NA <br /> Shift Basis: 3 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $257.09 NA <br /> Operating Cost/Hour: $273.21 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.55 NA <br /> Total unit Cost/Hour: $571.85 <br /> Total Fleet Cost/Hour: $4,574.82 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 513,158 <br /> Swell factor: 1.000 <br /> Loose volume: 513,158 LCY <br /> Source of estimated volume: Permit Appendix A,Table 1.4-2 <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 360 feet <br /> Unadjusted hourly 894.7 LCY/hr <br /> production: <br /> Materials consistency description: Consolidated stockpile 1.0 <br /> Average push -5 % <br /> gradient: <br /> Average site altitude: 7,000 feet <br />
The URL can be used to link to this page
Your browser does not support the video tag.