Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br />September 7, 2022 <br /> <br /> <br />Rex M. Hiner <br />R M Hiner Construction Co Inc <br />11 Austin Rd <br />Lamar, CO 81052-4301 <br /> <br /> <br />Re: Greeley Pit - File No. M-1977-151 <br /> R M Hiner Construction Co Inc <br /> Technical Revision (TR-3) <br /> Placement of backfill to eliminate excess GW exposure <br /> <br />Dear Rex M. Hiner: <br /> <br />On September 7, 2022 the Division of Reclamation, Mining and Safety concluded its review of the <br />Technical Revision application submitted to the Division on August 8, 2022, addressing the <br />following: <br /> <br />Revision to clarify amount of backfill required and where on-site it will be placed to eliminate the <br />excess groundwater exposure at the site for final reclamation. The required Surety Increase for <br />backfill import and placement will be initiated under a subsequent revision. <br /> <br />The decision reached by the Division is: approve. <br /> <br />The terms of Technical Revision No. 3 approved by the Division are hereby incorporated into Permit <br />No. M-1977-151. All other conditions and requirements of Permit No. M-1977-151 remain in full <br />force and effect. <br /> <br /> <br />Bond Held: $47,000.00 <br />Prior Liability: $47,000.00 <br />Change in Liability: $0.00 <br />Revised Liability: $47,000.00 <br />Prior Permit Acreage: 110.00 <br />Change in Permit Acreage: 0.00 <br />Revised Permit Acreage: 110.00 <br />Prior Affected Acreage: 110.00 <br />Change in Affected Acreage: 0.00 <br />Revised Affected Acreage: 110.00