My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-09-06_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2022-09-06_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2025 7:27:38 AM
Creation date
9/6/2022 10:12:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
Revision
Doc Date
9/6/2022
Doc Name Note
4th Adequacy Reponse
Doc Name
Adequacy Review Response
From
Colorado Legacy Land
To
DRMS
Type & Sequence
AM6
Email Name
AME
MAC
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO LEGACY LAND <br /> $CHWARTZWALDER MINE <br /> materials within the alluvial pad,can be performed.To allow for access to the contaminated soils in the alluvial <br /> valley, the water treatment plant was relocated up to the Mesa in 2018. The previous water treatment plant <br /> was demolished,and debris were returned to the underground mine in accordance with the Mine Permit(M- <br /> 1977-300). <br /> After the alluvial valley excavation is complete and the corresponding disturbed areas are reclaimed,the bypass <br /> pipeline and sump system shall be removed. CLL proposes allowing Ralston Creek to flow through the sluice <br /> gate at the cut off wall into its natural channel while the bypass pipeline infrastructure remains in place.This <br /> would allow CLL to monitor the water quality in Ralston Creek while the bypass pipeline infrastructure is still <br /> intact and determine the optimal time for removal. CLL intends to demolish the concrete wall (2 feet thick x <br /> 220 feet long x 20 feet high), footer (1 foot x 2 foot x 220 foot), and pipeline cradle foundations (ten total, 5- <br /> foot long each). Concrete and other demolition debris shall be broken into manageable pieces for offsite <br /> disposal. The bypass pipeline shall be cut into 30-foot sections,loaded on a truck and hauled offsite for disposal. <br /> E.4. MITIGATION PLAN FOR SOLID SOURCE TERM MATERIALS AND RECLAMATION <br /> PLAN FOR THE ALLUVIAL VALLEY <br /> Alluvial valley excavation began in 2018 and has progressed seasonally(late spring to early fall)to present day. <br /> In Technical Revision #14, the previous operator, Cotter Corporation presented the baseline scope for the <br /> excavation project. This document initially identified 33,000 to 54,0000 cubic yards(CY)cubic yards of soil for <br /> removal and onsite disposal in the Minnesota Adit. In accordance with 2013 Mine Plan Amendment 4, <br /> contaminated alluvial fill materials were excavated and placed in an underground stope known as the "Glory <br /> Hole",which is accessed through the Minnesota Adit of the Schwartzwalder Mine on the hillside well above the <br /> elevation of Ralston Creek on the southern side of the valley.When the Glory Hole reached capacity (-56,000 <br /> CY),and in accordance with 2021 Mine Plan Amendment 5,additional contaminated materials were placed in <br /> the open adit for the Black Forest Mine,a nearby former decorative rock mine that was only partially advanced <br /> before operations were permanently terminated. Because Black Forest Mine has recently reach capacity <br /> (-15,000 CY), CLL is requesting permission to dispose of additional materials by extending the South Waste <br /> Rock Pile (SWRP) to the south/south-east in front of the Former Black Forest Mine (-12,000 CY). CLL shall <br /> extend the SWRP consistent with the previously approved construction criteria and reclaim the newly <br /> disturbed areas consistent with the MLRP. These criteria are summarized below: <br /> • Placement Mao: Appendix 4 contains a plan set that illustrates the placement of materials to extend <br /> the SWRP. Technical Revision 14 initially scoped adding materials to the top of the SWRP, however <br /> CLL is proposing to extend the pile. This approach reduces the footprint of"new disturbance"and will <br /> create a more natural looking <br /> • CaR: Disturbed areas shall be capped with 3-feet of cover material. Cap material will be locally <br /> sourced from within the permit boundary from either the north side of Ralston Creek near the former <br /> laydown area,or from within the alluvial valley excavation area on the south side of Ralston Creek. <br /> • Reseeding: Disturbed areas shall be reseeded using the approved seed mix (Table E-1). Additional <br /> detail on reseeding is provided in the following section. <br /> The true spatial extent of the alluvial excavation project is not fully known.As the excavation work processes, <br /> and in accordance with Technical Revision 14, gamma radiation surveys are completed to guide excavations <br /> such that material are efficiently and effectively removed based on real time measurements. Figure E-2 <br /> illustrates the potential horizontal extent of contamination (up to 6.35 acres) from the most recent surface <br /> AUGUST 2022 12 AMENDMENT 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.