GRADING AND EROSION CONTROL STANDARD NOTES SC H M I DT PARCEL
<br /> 1 STORMWATER DISCHARGES FROM CONSTRUCTION SITES SHALL NOT CAUSE OR THREATEN TO CAUSE POLLUTION, w z w O
<br /> CONTAMINATION,OR DEGRADATION OF STATE WATERS ALL WORK AND EARTH DISTURBANCE SHALL BE DONE IN A MANNER In 1,w-.a-
<br /> THAT MINIMIZES POLLUTION OF ANY ON-SITE OR OFF-SITE WATERS,INCLUDING WETLANDS AGENCIES <<w 5 t3 D 7I
<br /> 1 2 NOTWITHSTANDING ANYTHING DEPICTED IN THESE PLANS IN WORDS OR GRAPHIC REPRESENTATION,ALL DESIGN AND COUNTY OF EL PASO, STATE OF COLORADO MO�zwwa>z
<br /> CONSTRUCTION RELATED TO ROADS,STORM DRAINAGE AND EROSION CONTROL SHALL CONFORM TO THE STANDARDS AND OWNER/DEVELOPER SR LL LAND, C
<br /> REQUIREMENTS OF THE MOST RECENT VERSION OF THE RELEVANT ADOPTED EL PASO COUNTY STANDARDS,INCLUDING THE D M RS & RECLAMATION PLAN 20 BOULDER CRESCENT,SUITE 201
<br /> LAND DEVELOPMENT CODE,THE ENGINEERING CRITERIA MANUAL,THE DRAINAGE CRITERIA MANUAL,AND THE DRAINAGE COLORADO SPRINGS,CO 80903 vOi p a w�O a¢
<br /> CRITERIA MANUAL VOLUME 2 ANY DEVIATIONS FROM REGULATIONS AND STANDARDS MUST BE REQUESTED,AND JAMES F SPRINGS.
<br /> (719)471-1742 w 00 ci O"�O
<br /> APPROVED.IN WRITING N C C z m>-_
<br /> zWdaWaJ1/11-
<br /> z aa0azw�
<br /> 3. A SEPARATE STORMWATER MANAGEMENT PLAN SMWP)FOR THIS PROJECT SHALL BE COMPLETED AND AN EROSION AND CIVIL ENGINEER JR ENGINEERING,LLC O�<<<<Ooa
<br /> STORMWATER QUALITY CONTROL PERMIT(ESOCP�ISSUED PRIOR TO COMMENCING CONSTRUCTION.MANAGEMENT OF THE 5475 TECH CENTER DR.0235
<br /> SWMP DURING CONSTRUCTION IS THE RESPONSIBILITY OF THE DESIGNATED QUALIFIED STORMWATER MANAGER OR CERTIFIED COLORADO SPRINGS,CO 80919 O
<br /> EROSION CONTROL INSPECTOR THE SWMP SHALL BE LOCATED ON SITE AT ALL TIMES DURING CONSTRUCTION AND SHALL MIKE BRAMLETT P E (303)267-6240 rn
<br /> BE KEPT UP TO DATE WITH WORK PROGRESS AND CHANGES IN THE FIELD !- O
<br /> z 00 �
<br /> 4 ONCE THE ESQCP IS APPROVED AND A NOTICE TO PROCEED'HAS BEEN ISSUED,THE CONTRACTOR MAY INSTALL COUNTY ENGINEERING EL PASO COUNTY PLANNING U O w O
<br /> THE INITIAL STAGE EROSION AND SEDIMENT CONTROL MEASURES AS INDICATED ON THE APPROVED GEC A AND COMMUNITY DEVELOPMENT D= V N U "]
<br /> PRECONSTRUCTION MEETING BETWEEN THE CONTRACTOR,ENGINEER,AND EL PASO COUNTY WILL BE HELD PRIOR 70 ANY COLOR RICE,SPRNGS.80910 00 O O Vi
<br /> CONSTRUCTION IT IS THE RESPONSIBILITY OF THE APPLICANT TO COORDINATE THE MEETING TIME AND PLACE WITH STANDARD NOTES FOR EL PASO COUNTY JEFF o
<br /> R COUNTY STAFF W U Z m
<br /> 5. CONTROL MEASURES MUST BE INSTALLED PRIOR TO COMMENCEMENT OF ACTIVITIES THAT COULD CONTRIBUTE POLLUTANTS 11 CONSTRUCTION PLANS TRAFFIC ENGINEERING EL PASO COUNTY DEPARTMENT OF Q Q H'If 01
<br /> TO STORMWATER CONTROL MEASURES FOR ALL SLOPES,CHANNELS,DITCHES,AND DISTURBED LAND AREAS SHALL BE 1 ALL DRAINAGE AND ROADWAY CONSTRUCTION SHALL MEET THE STANDARDS PUBLIC WORKS a m O 1n
<br /> INSTALLED IMMEDIATELY UPON COMPLETION OF THE DISTURBANCE AND SPECIFICATIONS OF THE CITY OF COLORADO SPRINGS/EL PASO COUNTY 3275 AKERS DRIVE O N Z v
<br /> 6 ALL TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES SHALL BE MAINTAINED AND REMAIN IN EFFECTIVE DRAINAGE CRITERIA MANUAL,VOLUMES I AND 2,AND THE EL PASO COUNTY COLORADO,SPRINGS,CO 80922 a O O H-
<br /> OPERATING CONDITION UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED AND FINAL STABILIZATION ) ENGINEERING CRITERIA MANUAL JENNIFER IRVINE,PE (719)520-6460 DO Q Q 2
<br /> IS ESTABLISHED ALL PERSONS ENGAGED IN LAND DISTURBANCE ACTIVITIES SHALL ASSESS THE ADEQUACY OF CONTROL I ON WO a
<br /> MEASURES AT THE SITE AND IDENTIFY IF CHANGES TO THOSE CONTROL MEASURES ARE NEEDED TO ENSURE THE 2 CONTRACTOR SHALL BE RESPONSIBLE FOR THE NOTIFICATION AND FIELD
<br /> CONTINUED EFFECTIVE PERFORMANCE OF THE CONTROL MEASURES ALL CHANGES TO TEMPORARY SEDIMENT AND EROSION 1 NOTIFICATION OF ALL EXISTING UTILITIES,WHETHER SHOWN ON THE PLANS FIRE DISTRICT BLACK FOREST FIRE PROTECTION DISTRICT
<br /> CONTROL MEASURES MUST BE INCORPORATED INTO THE STORMWATER MANAGEMENT PLAN OR NOT,BEFORE BEGINNING CONSTRUCTION LOCATION OF EXISTING UTILITIES 11M5 TEACHQUT ROAD O
<br /> j SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION CALL 811 CHIEF JACK(CO 49584300 U
<br /> 7 TEMPORARY STABILIZATION SHALL BE IMPLEMENTED ON DISTURBED AREAS AND STOCKPILES WHERE GROUND DISTURBING ll TO CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO(UNCC)
<br /> CONSTRUCTION ACTIVITY HAS PERMANENTLY CEASED OR TEMPORARILY CEASED FOR LONGER THAN 14 DAYS I 3. CONTRACTOR SHALL KEEP A COPY OF THESE APPROVED PLANS,THE
<br /> 8 FINAL STABILIZATION MUST BE IMPLEMENTED AT ALL APPLICABLE CONSTRUCTION SITES FINAL STABILIZATION IS ACHIEVED ( GRADING AND EROSION CONTROL PUN,THE STORMWATER MANAGEMENT S{
<br /> l PLAN(SWMP),THE SOIL AND GEOTECHNICAL REPORT,AND THE APPROPRIATE 1O
<br /> WHEN ALL GROUND DISTURBING ACTIVITIES ARE COMPLETE AND ALL DISTURBED AREAS EITHER HAVE A UNIFORM DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS AT THE JOB
<br /> VEGETATIVE COVER WITH INDIVIDUAL PLANT DENSITY M 70 PERCENT OF PRE-DISTURBANCE LEVELS ESTABLISHED OR I / SITE AT ALL TIMES,INCLUDING THE FOLLOWING.
<br /> EQUIVALENT PERMANENT ALTERNATIVE STABILIZATION METHOD IS IMPLEMENTED ALL TEMPORARY SEDIMENT AND EROSION I_ 3.1. EL PASO COUNTY ENGINEERING CRITERIA MANUAL(ECM)
<br /> CONTROL MEASURES SHALL BE REMOVED UPON FINAL STABILIZATION AND BEFORE PERMIT CLOSURE I 32. CITY OF COLORADO SPRINGS/EL PASO COUNTY DRAINAGE CRITERIA yyy��y
<br /> 9 ALL PERMANENT STORMWATER MANAGEMENT FACILITIES SHALL BE INSTALLED AS DESIGNED IN THE APPROVED PLANS ANY I MANUAL,VOLUMES 1 AND 2
<br /> PROPOSED CHANGES THAT AFFECT THE DESIGN OR FUNCTION OF PERMANENT STORMWATER MANAGEMENT STRUCTURES Q 1 SPE}} COLORADO DEPARTMENT OF TRANSPORTATION(COOT)STANDARD
<br /> MUST BE APPROVED BY THE ECM ADMINISTRATOR PRIOR TO IMPLEMENTATION ) I - 3 4 CO CIFICATIONS AND BRIDGE CONSTRUCTION
<br /> OT M&S STANDARDS .M
<br /> V1� 5
<br /> 10 EARTH DISTURBANCES SHALL BE CONDUCTED IN SUCH A MANNER SO AS TO EFFECTIVELY MINIMIZE ACCELERATED SOIL I I �, 4 NOTWITHSTANDING ANYTHING DEPICTED IN THESE PLANS IN WORDS OR Rr 5§
<br /> EROSION AND RESULTING SEDIMENTATION ALL DISTURBANCES SHALL BE DESIGNED,CONSTRUCTED,AND COMPLETED SO ~
<br /> PRAT THE POSED AREA OF ANY DISTURBED LAND SHALL BE LIMITED TO THE SHORTEST PRACTICAL PERIOD OF TIME 1 Ul GRAPHIC REPRESENTATION,ALL DESIGN AND CONSTRUCTION RELATED TO ry�
<br /> PRE-EXISTING VEGETATION SHALL BE PROTECTED AND MAINTAINED WITHIN 50 HORIZONTAL FEET OF A WATERS OF THE / !� ) ROADS,STORM DRAINAGE AND EROSION CONTROL SHALL CONFORM TO THE
<br /> STATE UNLESS SHOWN TO BE INFEASIBLE AND SPECIFICALLY REQUESTED AND APPROVED O I STANDARDS AND REQUIREMENTS OF THE MOST RECENT VERSIONS OF THE
<br /> RELEVANT ADOPTED EL PASO COUNTY STANDARDS,INCLUDING THE LAND
<br /> 11 COMPACTION OF SOIL MUST BE PREVENTED IN AREAS DESIGNATED FOR INFILTRATION CONTROL MEASURES OR WHERE Y ¢ ir-j IN DEVELOPMENT CODE,THE EINGEERI9NG CRITERIA MANUAL,THE DRAINAGE
<br /> FINAL STABILIZATION WILL BE ACHIEVED BY VEGETATIVE COVER AREAS DESIGNATED FOR INFILTRATION CONTROL MEASURES U �+ 1 c� CRITERIA MANUAL,AND THE DRAINAGE CRITERIA MANUAL VOLUME 2 ANY ~I<
<br /> SHALL ALSO BE PROTECTED FROM SEDIMENTATION DURING CONSTRUCTION UNTIL FINAL STABILIZATION IS ACHIEVED IF Q DEVIATIONS FROM REGULATIONS AND STANDARDS MUST BE REQUESTED,AND
<br /> COMPACTION PREVENTION IS NOT FEASIBLE DUE TO SITE CONSTRAINTS,ALL AREAS DESIGNATED FOR INFILTRATION AND m I ;I 1 APPROVED, F WRITING ANY MODIFICATIONS NECESSARY ES MEET CRITERIA
<br /> ' AFTER-THE-FACT WILL BE ENTIRELY THE DEVELOPER'S RESPONSIBILITY 70
<br /> VEGETATION CONTROL MEASURES MUST BE LOOSENED PRIOR TO INSTALLATION OF THE CONTROL MEASURE(S) 1 RECTIFY
<br /> 12 ANY TEMPORARY OR PERMANENT FACILITY OESGNED AND CONSTRUCTED FOR THE CONVEYANCE OF STORMWATER AROUND, � SITE / J 5 IT IS THE DESIGN ENGINEER'S RESPONSIBILITY TO ACCURATELY SHOW
<br /> THROUGH,OR FROM THE EARTH DISTURBANCE AREA SHALL BE A STABILIZED CONVEYANCE DESIGNED TO MINIMIZE EROSION / '9f- U EXISTING CONDITIONS,BOTH ONSITE AND OFFSITE.ON THE CONSTRUCTION
<br /> AND THE DISCHARGE OF SEDIMENT OFF 517E p PLANS ANY MOOIFICATIONS NECESSARY DUE TO CONFLICTS,OMISSIONS,OR
<br /> 13 CONCRETE WASH WATER SHALL BE CONTAINED AND DISPOSED OF IN ACCORDANCE WITH THE SWMP NO WASH WATER I yr2 CHANGED CONDITIONS WILL BE ENTIRELY THE DEVELOPER'S RESPONSIBILITY
<br /> SHALL BE DISCHARGED 70 OR ALLOWED TO ENTER STATE WATERS,INCLUDING ANY SURFACE OR SUBSURFACE STORM i TO RECTIFY
<br /> DRAINAGE SYSTEM OR FACILITIES CONCRETE WASHOUTS SHALL NOT BE LOCATED IN AN AREA WHERE SHALLOW 6 CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH EL
<br /> GROUNDWATER MAY BE PRESENT,OR WITHIN 50 FEET OF A SURFACE WATER BODY,CREEK OR STREAM 1 - �O '� PASO COUNTY PLANNING AND COMMUNITY DEVELOPMENT INSPECTIONS,PRIOR
<br /> 14 DURING DEWATERING OPERATIONS OF UNCONTAMINATED GROUND WATER MAY BE DISCHARGED ON SITE,BUT SHALL NOT �Q• TO STARTING CONSTRUCTION
<br /> C~E ROAD p
<br /> /
<br /> LEAVE THE SITE IN THE FORM OF SURFACE RUNOFF UNLESS AN APPROVED STATE DEWATERING PERMIT IS IN PLACE
<br /> 7 IT IS THE CONTRACTOR'S RESPIXJSBILITV 70 UNDERSTAND THE
<br /> 15 EROSION CONTROL BLANKETING OR OTHER PROTECTIVE COVERING SHALL BE USED ON SLOPES STEEPER THAN 3 1 - �U- REQUIREMENTS OF ALL JURISDICTIONAL AGENCIES TO OBTAIN ALL REQUIRED m
<br /> PERMITS,INCLUDING BUT NOT LIMITED TO EL PASO COUNTY EROSION AND
<br /> 16 CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL WASTES FROM THE CONSTRUCTION SITE FOR DISPOSAL IN \ STORMWATER QUALITY CONTROL PERMIT(ESQCP),REGIONAL BUILDING
<br /> ACCORDANCE WITH LOCAL AND STATE REGULATORY REQUIREMENTS.NO CONSTRUCTION DEBRIS,TREE SLASH,BUILDING FLOODPLAIN DEVELOPMENT PERMIT,U 5 ARMY CORPS OF ENGINEERS-ISSUED
<br /> MATERIAL WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURIED,DUMPED.OR DISCHARGED AT THE SITE ✓ I PERMITS 401 AND/DR 404 PERMITS,AND COUNTY AND STATE FUGITIVE DUST
<br /> 17 WASTE MATERIALS SHALL NOT BE TEMPORARILY PLACED OR STORED IN THE STREET,ALLEY,OR OTHER PUBLIC WAY,
<br /> UNLESS IN ACCORDANCE WITH AN APPROVED TRAFFIC CONTROL PUN.CONTROL MEASURES MAY BE REQUIRED BY EL I 8 CONTRACTOR SMALL NOT DEVIATE FROM THE PLANS WITHOUT FIRST
<br /> PASO COUNTY ENGINEERING IF DEEMED NECESSARY,BASED ON SPECIFIC CONDITIONS AND CIRCUMSTANCES OBTAINING WRITTEN APPROVAL FROM THE DESIGN ENGINEER AND PCD
<br /> CONTRACTOR SHALL NOTIFY THE DESIGN ENGINEER IMMEDIATELY UPON
<br /> 18 TRACKING OF SOILS AND CONSTRUCTION DEBRIS OFF-SITE SHALL BE MINIMIZED MATERIALS TRACKED OFF-SITE SHALL BE E wo DISCOVERY OF ANY ERRORS OR INCONSISTENCIES
<br /> CLEANED UP AND PROPERLY DISPOSED OF IMMEDIATELY 9 CONTRACTOR SHALL COORDINATE GEOTECHNICAL TESTING PER ECM
<br /> 19 THE OWNER/DEVELOPER SHALL BE RESPONSIBLE FOR THE REMOVAL OF ALL CONSTRUCTION DEBRIS,DIRT,TRASH,ROCK, STANDARDS PAVEMENT DESIGN SHALL BE APPROVED BY EL PASO COUNTY
<br /> SEDIMENT,SOIL,AND SAND THAT MAY ACCUMULATE IN ROADS,STORM DRAINS AND OTHER DRAINAGE CONVEYANCE I PCD PRIOR TO PLACEMENT OF CURB AND GUTTER AND PAVEMENT
<br /> SYSTEMS AND STORMWATER APPURTENANCES AS A RESULT OF SITE DEVELOPMENT i 10 ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE AT APPROVED
<br /> 20 THE QUANTITY OF MATERIALS STORED ON THE PROJECT SITE SHALL BE LIMITED,AS MUCH AS PRACTICAL,TO THAT
<br /> / CONSTRUCTION ACCESS POINTS
<br /> QUANTITY REQUIRED TO PERFORM THE WORK IN AN ORDERLY SEQUENCE ALL MATERIALS STORED ON-SITE SHALL BE 11 SIGHT VISIBILITY TRIANGLES ARE IDENTIFIED IN THE PLANS SHALL BE
<br /> STORED IN A NEAT,ORDERLY MANNER,IN THEIR ORIGINAL CONTAINERS,WITH ORIGINAL MANUFACTURER'S LABELS PROVIDED AT ALL INTERSECTIONS.OBSTRUCTIONS GREATER THAN 18 INCHES
<br /> 21 NO CHEMICAL(S)HAVING THE POTENTIAL TO BE RELEASED IN STORMWATER ARE TO BE STORED DR USED ONSITE UNLESS VICINITY MAP ABOVE FLOWIJNE ARE NOT ALLOWED IN SIGHT TRIANGLES O
<br /> PERMISSION FOR THE USE OF SUCH CHEMICAL())IS GRANTED IN WRITING BY THE ECM ADMINISTRATOR IN GRANTING SCALE 1'=2000 12 SIGNING AND STRIPING SHALL COMPLY WITH EL PASO COUNTY DEPARTMENT 5
<br /> APPROVAL FOR THE USE OF SUCH CHEMICAL(S),SPECIAL CONDITIONS AND MONITORING MAY BE REQUIRED OF PUBLIC WORKS AND MUTCD CRITERIA
<br /> 22 BULK STORAGE OF ALLOWED PETROLEUM PRODUCTS OR OTHER ALLOWED LIQUID CHEMICALS IN EXCESS OF 55 GALLONS 13.CONTRACTOR SHALL OBTAIN ANY PERMITS REQUIRED BY EL PASO COUNTY
<br /> SHALL REWIRE ADEQUATE SECONDARY CONTAINMENT PROTECTION TO CONTAIN ALL SPILLS ONSITE AND TO PREVENT ANY DEPARTMENT OF PUBUC WORKS,INCLUDING WORK WITHIN THE z
<br /> SPILLED MATERIALS FROM ENTERING STATE WATERS.ANY SURFACE OR SUBSURFACE STORM DRAINAGE SYSTEM OR OTHER RIGHT-OF-WAY AND SPECIAL TRANSPORT PERMITS.
<br /> FACILITIES. p 1v
<br /> 23.NO PERSON SHALL CAUSE THE IMPEDIMENT OF STORMWATER FLOW IN THE CURB AND GUTTER OR DITCH EXCEPT WITH 14 THE LIMITS OF CONSTRUCTION SHALL REMAIN WITHIN THE PROPERTY LINE 0O Q
<br /> APPROVED SEDIMENT CONTROL MEASURES UNLESS OTHERWISE NOTED THE OWENER/DEVELOPER SHALL OBTAIN WRITTEN tV Z Q Q
<br /> PERMISSION AND EASEMENTS,WHERE REQUIRED,FROM ADJOINING PROPERTY II
<br /> 24.OWNER/DEVELOPER AND THEIR AGENTS SHALL COMPLY WITH THE-COLORADO WATER QUALITY CONTROL ACT'(TITLE 25, CONSTRUCTION PRIOR TO ANY OFF-SITE DISTURBANCE,GRADING,OR IA
<br /> ARTICLE B.CRS),AND THE CLEAN WATER ACT'(33 USC 1344).IN ADDITION TO THE REQUIREMENTS OF THE LAND m > m
<br /> DEVELOPMENT CODE,DCM VOLUME II AND THE ECM APPENDIX 1 ALL APPROPRIATE PERMITS MUST BE OBTAINED BY THE SHEET INDEX w
<br /> CONTRACTOR PRIOR TO CONSTRUCTION(1041,NPDES,FLOODPLAIN,404.FUGITIVE DUST,ETC) IN THE EVENT OF < < w o m w
<br /> CONFLICTS BETWEEN THESE REQUIREMENTS AND OTHER LAWS,RULES,OR REGULATIONS OF OTHER FEDERAL,STATE, 1 - COVER SHEET U U
<br /> LOCAL,OR COUNTY AGENCIES,THE MOST RESTRICTIVE LAWS,RULES,OR REGULATIONS SHALL APPLY 2 - LEGEND
<br /> 3 - DMRS k RECLAMATION PLAN = w o =
<br /> 25.ALL CONSTRUCTION TRAFFIC MUST ENTER/EXIT THE SITE ONLY AT APPROVED CONSTRUCTION ACCESS POINTS 4 - DETAIL SHEET OWNER/DEVELOPER STATEMENT U
<br /> 26 PRIOR TO CONSTRUCTION THE PERMITTEE SHALL VERIFY THE LOCATION OF EXISTING UTILITIES I, THE OWNER/DEVELOPER HAVE READ AND WILL COMPLY NTH THE
<br /> REQUIREMENTS OF THE GRADING AND EROSION CONTROL PLAN
<br /> 27.A WATER SOURCE SHALL BE AVAILABLE ON SITE DURING EARTHWORK OPERATIONS AND SHALL BE UTILIZED AS REQUIRED
<br /> TO MINIMIZE DUST FROM EARTHWORK EQUIPMENT AND WND
<br /> 28 THE SOILS REPORT FOR THIS SITE HAS BEEN PREPARED BY (DATED XX/XX/20XX)AND SHALL BE
<br /> CONSIDERED A PART OF THESE PLANS J
<br /> 29.AT LEAST TEN(10)DAYS PRIOR TO THE ANTICIPATED START OF CONSTRUCTION,FOR PROJECTS THAT WILL DISTURB ONE JAMES F MORLEY DATE w
<br /> (1)ACRE OR MORE,THE OWNER OR OPERATOR OF CONSTRUCTION ACTIVITY SHALL SUBMIT A PERMIT APPLICATION FOR U-1
<br /> STORMWATER DISCHARGE TO THE COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT,WATER QUALITY • SR LAND, LLC IJ.J
<br /> DIVISION THE APPUCATION CONTAINS CERTIFICATION OF COMPLETION OF A STORMWATER MANAGEMENT PLAN(SWMP),OF 20 BOULDER CRESCENT, SUITE 201 Q =
<br /> WHICH THIS GRADING AND EROSION CONTROL PLAN MAY BE A PART FOR INFORMATION OR APPLICATION MATERIALS COLORADO SPRINGS, CO 80903 a N
<br /> CONTACT ENGINEER'S STATEMENT
<br /> COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT
<br /> WATER QUALITY CONTROL DIVISION THIS GRADING AND EROSION CONTROL PLAN WAS PREPARED UNDER MY ;
<br /> _ WOCD-PERMITS DIRECTION AND SUPERVISION AND IS CORRECT TO THE BEST OF MY
<br /> 4300 CHERRY CREEK DRIVE SOUTH KTIOW Wneesbelow. KNOWLEDGE AND BELIEF SAID PLAN HAS BEEN PREPARED ACCORDING T �
<br /> k DENVER,CO 80246-1530 Ca��before OU dl THE CRITERIA ESTABLISHED BY THE COUNTY FOR GRADING AND EROSION =
<br /> ATTN: PERMITS UNIT y 9. CONTROL PLANS I ACCEPT RESPONSIBILITY FOR ANY LIABILITY CAUSED U
<br /> S PBY AN REPARING NEGLTHIIGENT
<br /> ACTS, ERRORS OR OMISSIONS ON MY PART IN N
<br /> T 323M ^
<br /> PERMIT: M-83-035 MIKE A BRAMLETT, P.E. VE SHEET 1 OF 4
<br /> COLFOR DAND 0ON BEHALF OF JR ENGINEERIN�Jni l
<br /> JOB NO 25188.13