Laserfiche WebLink
Section 20 GW Monitoring Program <br /> Plezometer Information and Water Levels <br /> Nptn t,c Top of PVC.feet <br /> Date Measuned MW-2 L M*5 <br /> Drilling estimate 1114/2021 25 24 25 23 14.00 27.00 <br /> 1228/2021 26.40 25.50 21,10 28.40 30.2 22.20 28.80 <br /> 3/162022 26.60 25.9D 2140 28.30 30.20 22.00 28.60 <br /> 5/232022 26.70 25.70 20.60 26.20 28.20 20.00 27.80 <br /> 6222022 26.70 24.40 19,90 24.10 27.60 18.70 26.30 <br /> 71152022 28.60 2440 18.70 24.50 27.20 18.50 26,00 <br /> MW:1 MW-2 MW-4 MW-5 MW-6 MW-7 <br /> 12128/2021 4,725.90 4,717.50 4,723.70 4,728.60 4,733.90 4735.3 4,726.82 <br /> 3116/2022 4,725.70 4,717.10 4,723.40 4,728.70 4,733.90 4735.5 4,727.D2 <br /> 51232022 4,725.60 4,717.30 4,724.20 4,730.80 4,735.90 4737.5 4,727.82 <br /> 6/222022 4,725.60 4,718.60 4,724.90 4,732.90 4,736.50 4738.8 4,729.32 <br /> 7/152022 4,723.70 4,718.60 4,726.10 41732. 4,736.90 4739.0 4,729.62 <br />