Laserfiche WebLink
TABLE OF CONTENTS <br /> Paqe <br /> 1.0 INTRODUCTION.............................................................................................................................................1 <br /> 2.0 AREA GEOLOGY............................................................................................................................................1 <br /> 3.0 SITE GEOLOGY..............................................................................................................................................1 <br /> 4.0 EXISTING GROUNDWATER CONDITIONS...................................................................................................2 <br /> 5.0 GROUNDWATER MODEL..............................................................................................................................3 <br /> 5.1 Regional Topography........................................................................................................................3 <br /> 5.2 Bedrock Surface................................................................................................................................3 <br /> 5.3 Hydraulic Conductivity.......................................................................................................................4 <br /> 5.4 Specific Yield.....................................................................................................................................4 <br /> 5.5 Boundary Conditions.........................................................................................................................4 <br /> 5.6 Internal Influences.............................................................................................................................5 <br /> 6.0 MODEL SIMULATIONS...................................................................................................................................6 <br /> 6.1 Existing Conditions............................................................................................................................6 <br /> 6.2 Slurry Wall Installation.......................................................................................................................7 <br /> 6.3 Mitigation Alternatives.......................................................................................................................9 <br /> 6.3.1 Cell 5S Slurry Wall Mitigation Scenarios................................................................................10 <br /> 6.3.2 Drain Recharge......................................................................................................................11 <br /> 7.0 CONCLUSIONS............................................................................................................................................12 <br /> 8.0 BIBLIOGRAPHY............................................................................................................................................12 <br /> Tables <br /> Table1 Boundary Conditions.......................................................................................................................................5 <br /> Table 2 Measured and Modeled Site Groundwater Levels...........................................................................................7 <br /> Table 3 Mining Groundwater Level Table(Slurry Walls In-Place)................................................................................8 <br /> Table 4 Base Model and Modeled Site Groundwater Level After Cell 3,4, and 5N Slurry Walls.................................9 <br /> Table 5 Base Model and Modeled Site Groundwater Level After Cell 3,4, 5N and 6 Slurry Walls............................10 <br /> Table 6 Water Diversion Necessary With or Without Cell 5S Slurry Wall...................................................................10 <br /> Table 7 Groundwater Surface Elevations with Drain Install Options...........................................................................11 <br /> Groundwater Model Report—Section 20 Gravel Mine Site -ii- August 2022 <br />