66.After the berm has been established the remaining segregated topsoil will be stockpiled in <br /> the northern portion of Cell 7. <br /> Overburden,clay and any other material that is uneconomical to sell will be stockpiled in the <br /> northern portion of Cell 7 to be used in Stage 2 slope reclamation. <br /> Stage 2-will consist of mining out Cell 3 in the north-east comer of the site. Mining will be <br /> completed in three(3)year long phases and will progress from west to east. Cell 3 will be a <br /> slung wail lined cell and will be dry mined. <br /> Topsoil from this stage will be segregated and stockpiled in the northern portion of Cell 7. <br /> In the initial phase, overburden will be stockpiled existing stockpile in Cell 7. Once the first <br /> phase has been completely mined out, reclamation will begin on that phase and overburden <br /> material from the other phases will be placed directly in the reclamation slopes or sold. <br /> Stage 3—will consist of mining out Cell 4 and concurrently reclaiming Cell 3. Cell 4 contains <br /> three(3)approximately one(1)year phases. Cell 4 will be a slurry wall lined cell and will be <br /> dry mined. <br /> Topsoil from this stage will be segregate and stockpiled in the northern portion of Cell 7 as <br /> indicated on the map. <br /> Slope reclamation of the previous phases will be concurrent with mining. Overburden will be <br /> placed in the reclamation slope or stockpiled in the bottom of the pit next to the current <br /> reclamation phase. Excess overburden will be placed in the southwest corner of Cell 6 to fill in <br /> the future commercial area. <br /> Stage 4—will consist of mining out Cell 5 and concurrently reclaiming Cell 4. Cell 5 contains <br /> seven (7)approximately one (1)year phases. Cell 5 will be a slurry wall lined cell and will be <br /> dry mined. <br /> Topsoil from this stage will be segregate and stockpiled in the northern portion of Cell 7 as <br /> indicated on the map. <br /> Slope reclamation of the previous phases will be concurrent with mining. Overburden will be <br /> placed in the reclamation slope or stockpiled in the bottom of the pit next to the current <br /> reclamation phase. <br /> Stage 5—will consist of mining out Cell 6 and concurrently reclaiming Cell 5. Cell 6 contains <br /> four(4)approximately one(1)year phases. Cell 6 will be a slurry wall lined cell and will be dry <br /> mined. <br /> Topsoil from this stage will be segregate and stockpiled in the western portion of Cell <br /> 2(Siltation Pit)to be utilized in reclamation of the silt pond back to native grade. <br /> Slope reclamation of the previous phases will be concurrent with mining. Overburden will be <br /> placed in the reclamation scope or stockpiled in the bottom of the pit next to the current <br /> reclamation phase.Any overburden not used in slope reclamation will be placed in the unused <br /> portion of Cell 2(Siltation Pond). <br /> Section 20—Gravel Mine—MLRB 112 Permit Amendment <br /> Exhibit D-2 <br />