Laserfiche WebLink
N <br />E 1408000E 1410000E 1412000E 1412000E 1414000E 1414000E 1416000E 1416000E 1418000E 1418000N 400000 N 400000 <br />N 402000 N 402000 <br />N 404000 N 404000 <br />N 406000 N 406000 <br />N 408000 N 408000 <br />N 410000 N 410000 <br />N 412000 N 412000 <br />N 414000 N 414000 <br />400 0 400 800 1200 <br />1 2 3 <br />Trapper MineE 1410000E 1408000TOPSOIL STRIPPING <br />AND RECLAIM <br />L:\ Engineer \ Permits \ TR-130 \ Maps \M10B_TR130.dwg <br />PERMIT BOUNDARY <br />TOPSOIL STRIP LIMITS <br />TOPSOIL RECLAIM LIMITS <br />PROPOSED YEARLY ADVANCE <br />PROPOSED YEARLY ADVANCE 2020 2020 STRIP <br />2020 STRIP <br />2020J PIT DIVERSION DITCH <br />DIVERS <br />I <br />O <br />N <br /> <br />D <br />I <br />T <br />C <br />H <br />DIVERSION DITCH <br />2022 STRIP <br />2021 <br />2022 STRIP2022 STRIP <br /> 2022 STRIP <br />2022 RECLAIM <br />2022 STRIP <br />2022 RECLAIM <br />Note: Production may fluctuate according to economic, <br />geologic, or other conditions. Limits are shown for <br />maximum possible production from 2018 through 2022. <br />Operations may actually progress slower than depicted <br />on these maps. Backfilling, grading, and topsoil <br />laydown will follow mining operations in a timely <br />manner.