Laserfiche WebLink
Table A-2 Equipment Unit Costs & Correction Factors Page No.3 <br />Unit costs taken from RN-07 DRMS Circes Estimate dated 7/10/2017 and an update provided by DRMS on 5/31/2022 <br />Table A-2.1 Fleet Cost - Regrading Pits <br />Fleet 1 - Dozer Only <br /> Ownership Oper. Cost <br />Equip Cost/Hour Cost/Hour Attachments Operator Total <br />triple shift <br />Cat D11T - 11U 274.04$ 273.21$ -$ 41.30$ 588.55$ From DRMS update June 2022 <br />Light Plant (50% of time)-$ -$ -$ -$ -$ <br /> <br />Total 274.04$ 273.21$ -$ 41.30$ 588.55$ <br />Dozer Fleet size 2 Dozers Fleet cost/hour 1,177.10$ <br /> Fleet Cost - Regrading Pits <br />Truck/Trackhoe <br /> Units Ownership Oper. Cost Operator Ripper Utilization Cost ea.Total Cost <br />Equipment Required Cost/Hour Cost/Hour ($/hr)NA ($/hr) ($/hr) <br />single shift <br />CAT 6090 1 23.07$ 930.15$ 37.32$ 990.54$ 990.54$ 100% <br />Komatsu 830E 3 222.38$ 210.26$ 34.67$ 467.31$ 1,401.93$ 100% <br />Motor Grader (Cat 16M)1 70.80$ 28.16$ 28.56$ 127.52$ 127.52$ 50% <br />Support (Load Area) Cat D11T-11SU 1 274.04$ 273.21$ 41.30$ -$ 588.55$ 588.55$ 0% <br />Support (Dump Area) Cat D11T-11SU 1 274.04$ 273.21$ 41.30$ -$ 588.55$ 588.55$ 100% <br />Water Truck- Water Tanker, 14000 Gal.1 103.16$ 67.28$ -$ 170.44$ 170.44$ 50% <br />Total 967.49$ 1,782.27$ 183.15$ 2,932.91$ 3,867.53$ <br />2,465.60$ without truck cost <br />3,867.53$ with 3 trucks