Laserfiche WebLink
Table A-10.4 Calculations for time required for topsoiling - J Pit (with Scrapers)Page No.12 <br />I Pit Extension <br />Production Adjusted* Fleet <br />Route Cubic Rate Production Scraper/Truck Fleet Cost Total <br />From Yards (cyds/hr)(cyds/hr) Hours Hours ($/hr) ($) ($/cy) <br />I Pit Middle 68,212 385 385 177.17 22.15 4,538.33$ 100,509.27$ 1.47$ <br />I Pit East 60,758 385 385 157.81 19.73 4,538.33$ 89,525.93$ 1.47$ <br />Total 128,970 385 385 335 42 4,538.33$ 190,035.20$ 1.47$ <br />Table A-10.4 Calculations for time required for topsoiling - J Pit (with Scrapers) <br />J Pit <br />Production Adjusted* Fleet <br />Route Cubic Rate Production Scraper/Truck Fleet Cost Total <br />From Yards (cyds/hr)(cyds/hr) Hours Hours ($/hr) ($) ($/cy) <br />J pit 16,875 385 385 43.83 5.48 4,538.33$ 24,865.73$ 1.47$ <br />Total 16,875 385 385 43.83 5.48 4,538.33$ 24,865.73$ 1.47$