Laserfiche WebLink
Table A-8.1 Regrade Diversions Page No.10 <br />Bottom X-SectionalVolume <br />Diversion Length (ft)Width (ft)Depth (ft)Area (sq ft)(cyds) <br />J Pit Diversion 5570 0.42 4.02 829 <br />Total 5570 829 <br />Table A-8.2 Regrade Diversions (cont.) <br />Volume Dozer Prod Correction Adjusted Dozer Dozer Dozer Blade Blade Cost Blade Total <br />Diversion (cyds)Rate Factor Prod Rate Hours Cost/HR Cost Hours $/HR Cost Cost ($) <br />J Pit Diversion 829 800 0.664 531.2 1.6 199.38$ 311.16$ 1.6 146.27$ 228.28$ 539.44$ <br />Total 829 800 0.664 531.2 1.6 199.38$ 311.16$ 1.6 146.27$ 228.28$ 539.44$ <br />Table A-8.2A Finish Grading <br />Area Productivity Graders Adjusted Fleet <br />(Acres)Ac./HR (Hours)No.Hours ($/HR)$/HR Cost ($) <br />79.94 3.6782 21.73 2.00 10.87 155.67$ 311.34$ 3,383.25$