Laserfiche WebLink
Table 1.1. Reclamation Summary for Trapper Mine (2020). <br />Ashmore Derringer L Z F N I J Non-pit <br />Pit Pit Pit Pit Pit Pit Pit Pit Areas Total <br />New Disturbance Acres <br /> Topsoil Strip Areas 8.4 26.8 175.9 29.5 29.7 1.2 271.5 <br /> Topsoil Pile Areas <br />Total 8.4 0.0 26.8 0.0 0.0 175.9 29.5 29.7 1.2 271.5 <br />Backfilled and Graded Areas <br />Total 0.0 0.0 19.3 0.0 0.0 0.0 0.0 0.0 0.0 19.3 <br />Topsoil Replacement Areas <br />Total 0.0 0.0 19.3 0.0 0.0 0.0 0.0 0.0 0.0 19.3 <br />Vegetated (Seeded) Acres <br /> Range Sites A&B 0.0 0.0 19.3 0.0 0.0 0.0 0.0 0.0 0.0 19.3 <br /> Range Site C <br /> Perennial Haycrop <br /> Temporary*0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />Total 0.0 0.0 19.3 0.0 0.0 0.0 0.0 0.0 0.0 19.3 <br />* Includes topsoil piles, diversion ditches, sediment ponds, drill pads, drainageways, and other temporarily reclaimed lands. <br />Disturbance to previously reclaimed parcels. <br />GCR 2/20 <br />M:\ANNUAL REPORTS\DRMS20RPT\20RECtab1-1