Laserfiche WebLink
SECTION 1.0 2020 Annual Reclamation Report <br /> <br /> <br />As specified by the revisions (1/3/90) to 2CCR 407-2, 2.04.13, Trapper Mine is submitting an Annual <br />Reclamation Report for the previous calendar year (2020). <br /> <br />Historically, section 3.5.3 of Trapper's mining and reclamation permit required a reclamation map be <br />submitted to the CDRMS annually by March 15. Subsequent to 1988 the map entitled the "Postmine <br />Contour Map" was changed to "Reclamation Map." The reclamation maps developed from aerial <br />photographs taken during the previous fall shows pit advancements, recontoured spoil areas and a <br />historical account of the previously regraded areas for the year. <br /> <br />The 2020 reclamation map is a composite of the aerial photographs taken by drone during 2020, and <br />shows the reclamation performed during 2020 for all areas under bond. Map(s) 1 show the aerial extent <br />and location of disturbed acres, graded acres, topsoiled acres and perennial seeded acres during 2020. <br />It also shows the location, aerial extent and reclamation year of all previously revegetated areas, as well <br />as the actual and projected mature shrub clump establishment areas, topsoil stripping areas and laydown <br />areas for 2020. <br /> <br />1.1 Permittee Identification <br /> <br />The Permittee for this annual reclamation report is: <br /> <br /> Trapper Mining Inc. <br /> P.O. Box 187 <br /> Craig CO 81626 <br /> Permit No. C-1981-010 <br /> <br />1.2 Results <br /> <br />Table 1.1 and Map(s) 1 show the 2020 reclamation results. The various reclamation stages are <br />addressed below in separate subsections. <br /> <br />1.2.1 Disturbed Acres <br /> <br />In 2020, Trapper disturbed 271.5 acres in the I Pit, L Pit and N Pit areas. Disturbance consisted <br />mostly of redisturbance of Phase III Bond released lands in the former A Pit area and the I Pit <br />area in the West Panel. Table 1.2 documents acres re-disturbed and the bond release status of <br />each. <br /> <br />1.2.2 Backfilled and Graded Acres <br /> <br />Trapper backfilled and graded approximately 19.3 acres in 2020 to final contour (AOC). These <br />acres were in the L Pit area. <br /> <br />1.2.3 Topsoiled Acres <br /> <br />Trapper re-topsoiled approximately 19.3 acres in 2020 to final contour (AOC). These acres <br />were in the L Pit area. <br /> <br />1.2.4 Seeded Acres <br /> <br />Trapper seeded a permanent vegetation mixture on approximately 19.3 acres in 2020 to final <br />contour (AOC). These acres were in the L Pit area. <br /> <br />1.2.5 Cultural Practices <br /> <br />In addition to 2020 replaced topsoil revegetation practices, Trapper also conducted several <br />other cultural practices. These practices are addressed below. <br />