My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-14_PERMIT FILE - C1981010
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2021-05-14_PERMIT FILE - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2022 3:00:14 PM
Creation date
8/22/2022 2:21:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
5/14/2021
Doc Name
Appendix W 2020 Report Section 1.0
Type & Sequence
TR127
Section_Exhibit Name
Appendix W 2020 Annual Reclamation Report Section 1.0
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3.0 2020 Drainage Reconstruction, Improvement and <br /> Repairs at Trapper Mine <br /> <br /> <br />3.1 Drainage Reconstruction 1987-2020 <br /> <br />At Trapper Mine, all or portions of nine major drainageways (Coyote, Johnson, Buzzard, No-Name, Oak, <br />Grouse, Horse, Flume and Pyeatt) and their tributaries have been regraded and appropriately treated to <br />reduce the erosion rate and assist in permanent channel stabilization from 1987 through 2020. At the <br />conclusion of the 2020 field season, approximately 141,870 linear feet (26.9 miles) of permanent <br />drainage reconstruction has been completed at Trapper Mine (Map 1). In 2020 – No new drainage <br />reconstruction occurred. <br /> <br /> <br /> <br />3.2 Drainage Improvements and Repairs <br /> <br />Improvements and repairs were performed to provide benefits to all drainages treated in 1987-2020 as <br />well as portions of undisturbed and disturbed drainage segments. Drainage improvements include dozer <br />basins constructed in newly stripped topsoil areas and on newly regraded spoils. Drainage repair and/or <br />enhancement were completed on approximately 11,200 linear feet of drainage ways in Flume drainages <br />during the 2020 field season. <br /> <br /> <br /> <br />3.3 Drainage Reconstruction Design Summary <br /> <br />Design criteria established with PR-07 shall be summarized for each year for the drainages <br />reconstructed on the site. Table 3.1 shows the model inputs for each drainage designed and <br />reconstructed for the reporting year. Map 1 indicates each drainage section reconstructed during the <br />reporting year. <br /> <br /> <br /> <br /> <br /> <br /> <br />GCR/BDN 3/21 <br />[DRMS20RPT\20 Drainage Repair text 3-0] <br />
The URL can be used to link to this page
Your browser does not support the video tag.