Laserfiche WebLink
SECTION 1.0 2019 Annual Reclamation Report <br /> As specified by the revisions (1/3/90)to 2CCR 407-2, 2.04.13, Trapper Mine is submitting an Annual <br /> Reclamation Report for the previous calendar year(2019). <br /> Historically, section 3.5.3 of Trapper's mining and reclamation permit required a reclamation map be <br /> submitted to the CDRMS annually by March 15. Subsequent to 1988 the map entitled the "Postmine <br /> Contour Map"was changed to "Reclamation Map." The reclamation maps developed from aerial <br /> photographs taken during the previous fall shows pit advancements, recontoured spoil areas and a <br /> historical account of the previously regraded areas for the year. <br /> The 2019 reclamation map is a composite of the aerial photographs taken by drone during 2019, and <br /> shows the reclamation performed during 2019 for all areas under bond. Map(s) 1 show the aerial extent <br /> and location of disturbed acres, graded acres, topsoiled acres and perennial seeded acres during 2019. <br /> It also shows the location, aerial extent and reclamation year of all previously revegetated areas, as well <br /> as the actual and projected mature shrub clump establishment areas, topsoil stripping areas and laydown <br /> areas for 2019. <br /> 1.1 Permittee Identification <br /> The Permittee for this annual reclamation report is: <br /> Trapper Mining Inc. <br /> P.O. Box 187 <br /> Craig CO 81626 <br /> Permit No. C-1981-010 <br /> 1.2 Results <br /> Table 1.1 and Map(s) 1 show the 2019 reclamation results. The various reclamation stages are <br /> addressed below in separate subsections. <br /> 1.2.1 Disturbed Acres <br /> In 2019, Trapper disturbed 77.2 acres in the N Pit consisting mostly of redisturbance of Phase <br /> III Bond released lands in the former A Pit area. Table 1.2 documents acres redisturbed and <br /> bond release status of each. <br /> 1.2.2 Backfilled and Graded Acres <br /> Trapper backfilled and graded approximately 196.7 acres in 2019 to final contour(AOC). These <br /> acres were in the L Pit (117.8 acres) and F Pit(78.9 acres) areas. <br /> 1.2.3 Topsoiled Acres <br /> Trapper re-topsoiled approximately 196.7 acres in 2019. These acres were in the L Pit(117.8 <br /> acres) and F Pit (78.9 acres) areas. <br /> 1.2.4 Seeded Acres <br /> Trapper seeded a permanent vegetation mixture on approximately 196.7 acres in 2019. These <br /> acres were in the L Pit (117.8 acres) and F Pit(78.9 acres) areas. <br /> 1.2.5 Cultural Practices <br /> In addition to 2019 replaced topsoil revegetation practices, Trapper also conducted several <br /> other cultural practices. These practices are addressed below. <br />