Laserfiche WebLink
SECTION 5.0 Topsoil Stockpile Locations <br /> Trapper's approved permit(Section 4.9.2) specifies that CDRMS will be provided with map(s) illustrating <br /> the location of topsoil stockpiles constructed during the previous year and the approximate locations for <br /> stockpiles proposed for construction during the upcoming year (Map 1). <br /> Table 5-1 lists all existing stockpiles with their identification nomenclature, coordinates (based on the <br /> approximate center of the pile), acres, construction date and volume; which is updated annually. <br /> During 2019, Trapper depleted topsoil pile A96-1 and portions of A97-2 and A98-2 for reclamation of <br /> parcel F-B-19; depleted topsoil pile 18-5 and portions of 19-1, 19-5 and K2-15 for reclamation of parcel <br /> L-AB-19. Trapper constructed two new topsoil piles during the 2019 field season. Piles 19-1 and 19-5 <br /> were constructed out of the 2019 Topsoil Stripping Project. <br /> At the end of 2019, excluding stockpiles abandoned with the approvals of MR-155 and TR-94, there are <br /> 61 existing topsoil stockpiles at Trapper affecting 151.3 acres and storing approximately 3,082,519 cubic <br /> yards of salvaged topsoil. <br /> Presently there are no proposed approximate locations for new topsoil stockpiles in 2019. Trapper is <br /> planning to utilize existing topsoil stockpiles and live haul stripping for the 2019 reclamation season. <br /> GCR/BDN 3/20 <br /> [Annual Report\DRMSI9RPT\19TStext5-0] <br />