Laserfiche WebLink
EXHIBIT D <br /> RECLAMATION PLAN <br /> (a) In this mining operation at any time we will have a <br /> significant amount of area open and ready for <br /> reclamation. <br /> (b) The slopes in this pit will be on a 3H to 1V or less but <br /> never more to help with the seeding process and <br /> erosion. <br /> (c) (1) We will reseed the mined to the original plant <br /> thickness. <br /> (ii) At any point during the mining process there is a <br /> significant about of area to reclaim it will be reclaimed at <br /> that time. <br /> (iii)The seed mixture will consist of Prairie junegrass, little <br /> bluestem, sideoats grama, and blue grama at 18 to 20 <br /> pounds per acre. <br /> (iv) The seeding will be drilled with a grass drill behind a <br /> tractor. If any mulch is used it will be cow manure mixed <br /> with some topsoil and tracked in with the dozer. <br />