Laserfiche WebLink
EXHIBIT C <br /> MINING PLAN <br /> (a) We are estimating that the pit will open in <br /> September 2022 and we plan to mine intermittently <br /> until the material is gone, hopefully that will be at least <br /> 15 years around 2037. <br /> (b&c) We are estimating the topsoil depth is around 6 <br /> inches with another 6 inches in overburden. All topsoil <br /> and overburden will be stock piled on the edge of the pit <br /> and used for a berm along the creek showed in the map <br /> as to help with flood control. <br /> (d) We are estimating that the depth of the material is <br /> around 20 feet. <br /> (e) This is going to be a basic 110 open mine about 6.67 <br /> acres in area. We will have one access road in and out off <br /> of Lincoln County Road 4C. <br /> (f) The most significant disturbances will be the dozing <br /> the topsoil and overburden to the berms and pushing the <br /> usuable material into piles to be hauled from. The <br /> stockpiles will be minimal but there will be some there <br /> probably all through out the year. <br />