Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilize reclamation crew and equipment <br /> Site: Hidden Valley Gravel Pit Permit Action: 2022 Inspection Permit/Job#: M1998024 <br /> PROJECT IDENTIFICATION <br /> Task#: 07A State: Colorado Abbreviation: None <br /> Date: 8/9/2022 County: Eagle Filename: 024-07a <br /> User: LDS <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D8T-8SU 47.71 $124.85 $101.82 1 $226.67 $101.82 $250.00 <br /> Cat 637G 57.28 $264.49 $136.92 1 $401.41 $136.92 $250.00 <br /> Subtotals: 1 $628.08 $238.74 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4A, 1 T. $24.30 1 $24.30 $24.30 <br /> Crew <br /> Subtotals: $24.30 $24.30 <br /> CIRCES Cost Estimating Software <br />