My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-08-10_INSPECTION - M1998024
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1998024
>
2022-08-10_INSPECTION - M1998024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 7:31:57 AM
Creation date
8/11/2022 2:15:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998024
IBM Index Class Name
Inspection
Doc Date
8/10/2022
Doc Name
Inspection Report
From
DRMS
To
Oldcastle SW Group , Incdba B & B Excavating
Inspection Date
6/13/2022
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#02A Page 2 of 2 <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.329 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4724 <br /> Adjusted unit production: 661.36 LCY/hr <br /> Adjusted fleet production: 661.36 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.399/LCY <br /> Total job time: 32.44 Hours <br /> Total job cost: $8,558 <br />
The URL can be used to link to this page
Your browser does not support the video tag.