Laserfiche WebLink
_ s\ „yA-—c.- C—h-awg snv�-D.s/s/22 �--ZIN D.El/5/22 <br /> 50.0 <br /> 45.0 <br /> PIPE VIDEO INSPECTION <br /> (NO JETTING) 5/18/18 <br /> 40.0 <br /> a <br /> J <br /> 3 <br /> 0 <br /> a <br /> 7 PIPES JETTED <br /> 35.0 10/05/20 <br /> c (NO VIDEO) <br /> c <br /> z <br /> F 30.0 <br /> 25.0 <br /> 20.0 <br /> 6/I/2016 12/I/2016 6/l/2017 12/I/2017 6/1/2018 12/l/2018 6/l/2019 12/l/2019 6/l/2020 12/I/2020 6/l/2021 12/1/2021 6/I/2022 <br /> Project No. 210105.13 August 2022 <br /> FIGURE 4 <br /> EngineeringAnalytics,Inc. UNDERDRAIN FLOW <br /> 2022 ANNUAL DAM SAFETY INSPECTION <br /> SAN LUIS TAILINGS STORAGE FACILITY <br />