Laserfiche WebLink
-4- <br /> 12. Primary future Post-minim land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> D Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) Solid Waste Disposal(WD) <br /> 13. Primary resent land use check one): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e.g.truck/shovel): <br /> Scraper and loader. Load semi-trucks and round trip soil to various locations for reclamation use. <br /> 15. On Site Processing: Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): <br /> Mining will be done through a variety of earth-moving equipment,including dozers,loaders,and scrapers.Mined top soil will then be loaded onto trucks for transport to the end user <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: <br /> N/A <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> N/A <br />