Laserfiche WebLink
Mobilization Worksheet Cont'd Task#004 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: LONGMONT <br /> Total one-way travel distance: 15.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,165.26 <br /> two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $0.00 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.30 0.30 <br /> Return Time(Hours): 0.30 0.30 <br /> Loading Time(Hours): 0.30 NA <br /> Unloading Time(Hours): 0.30 NA <br /> Subtotals: 1.20 0.60 <br /> JOB TIME AND COST <br /> Total job time: 2.40 Hours <br /> Total job cost: $2,165 <br /> CIRCES Cost Estimating Software <br />