• Quarterly water level/flow measurements and field parameters at the monitoring well, DP <br /> Spring and PR Spring. <br /> Whirlwind Mine Treatment Plant <br /> Discharge of treated water from the Mine is allowed in accordance with the Colorado Wastewater <br /> Discharge Permit System, Permit No. CO-0047562. EFRI has suspended use of the Mine water <br /> treatment plant until such time that dewatering operations resume. No water has been pumped <br /> from the Mine since December 2009, and Mine water has been allowed to accumulate in the Mine <br /> workings. As noted in EFRI's May 19, 2022 notice to DRMS, final engineering designs are now <br /> in progress with fabrication and delivery of new water treatment equipment which expected in late <br /> 2022 or early 2023, with dewatering commencing in early to mid-2023. Refer to Appendix 1, <br /> Attachment I of this report for a summary of mine water treatment. <br /> Whirlwind Mine and Packrat Mine <br /> The inflow within the Mine decline cannot be measured directly because it occurs over <br /> approximately 100 feet from the entrance of the decline and within the drifts. The water collects <br /> in the mine sump and is subsequently pumped to the surface when the Mine is dewatering. When <br /> the Mine is not being dewatered, the groundwater inflow can be calculated based on the <br /> approximate elevation level of accumulated mine water, and the void volume of the workings. <br /> Access to the Mine decline was restricted during the third quarter of 2012. As a result, flow rate <br /> and field parameter measurements were also put on hold until such time that dewatering is resumed <br /> and the mine pool becomes accessible after the completion of the decline rehabilitation. Historical <br /> flow rates and field parameters from the Mine decline water are included in Appendix 1, <br /> Attachment 2. Analytical data from the previous samples collected from the Mine are summarized <br /> in Appendix 2, Table 1. <br /> Characterization of mine water in the Packrat Mine could not be conducted, because the mine is <br /> not yet accessible. Appendix 1,Attachment 3 of this report is reserved for field data collected from <br /> the Packrat Mine at such time that it becomes accessible and is monitored. <br /> DP Spring <br /> The field parameters were measured at DP Spring on June 23, 2022. The flow is measured by <br /> timing the fill rate of a five-gallon bucket. Field parameters from DP Spring are measured in the <br /> stock tank located at the spring. The field sampling form is provided in Appendix 3. <br /> Flow rates and field parameters at DP Spring are summarized in Appendix 1, Attachment 4. <br /> 2 <br />