My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-29_REVISION - M2006084 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006084
>
2022-07-29_REVISION - M2006084 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2022 8:49:54 PM
Creation date
8/1/2022 8:25:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006084
IBM Index Class Name
Revision
Doc Date
7/29/2022
Doc Name
Request for Technical Revision
From
Old Castle SW Group, Inc dba United Companies
To
DRMS
Type & Sequence
TR1
Email Name
ACY
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table D-2 Permit Acreage Breakdown <br /> Permit Area Description Acreage <br /> Access Roads 0.5 <br /> Mining Area 74.54 <br /> Total Permit Area 92.74 <br /> Mining will progress roughly southeast to northwest. A table of expected mining lives for each Phase <br /> is included in Table D-3. The life of each Phase is based on the anticipated annual average tonnage <br /> (250,000 tons/yr). As mining progresses across the site, topsoil and overburden will be stripped from <br /> new mining areas and used to reclaim mined out areas. <br /> Table D-3 Mining Timetable <br /> Mining Years. Gravel(tons) <br /> '77 <br /> 77M <br /> 2 250,000 <br /> 4 250,000 <br /> 6 250,000 <br /> 8 250,000 <br /> 10 250,000 <br /> Total 2,700,000 <br /> Access to the site will be achieved by County Road 5 along the east side of the property. This access <br /> was constructed as part of the initial mining activity under the existing DRMS permit. <br /> Topsoil will be stored within the facilities area on the south side of the permit. Also, topsoil will be <br /> stored in a 7' high berm along the southern edge of the permit boundary. Topsoil will only be stored <br /> during the first four phases, since topsoil generated during latter phases of the operation will be used <br /> in reclamation. <br /> No explosives will be used in conjunction with the mining and reclamation operation. <br /> White River City D-4 0 Lewicki&Associates <br /> July 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.