Laserfiche WebLink
2. Reclamation Timetable <br />The time for reclamation is shown below. Exhibit L: Reclamation Costs describes the worst -case <br />bond scenario. <br />Table E-3 Reclamation Timetable <br />Description <br />Time to complete• <br />Mining <br />12 <br />250,000 <br />12 <br />redamatior, <br />Mining with concurrent <br />12 <br />250,006 <br />reclamation <br />AAini wieh c urrent 7t, <br />;- ' ,,,, " , ,,, `;,,,,, ,; ,;,,, 12 <br />M tom <br />„ . ,, ,,,; .,,, <br />Mining with concurrent 12 <br />250,000 <br />reclamation <br />Mini witty+ ttrrerft <br />1-7 ;,: ,,; „ , „ , ., 12, <br />,; <br />2SO,000 <br />Mining with concurrent 12 <br />250,000 <br />reclamation <br />12 <br />Mining with concurrent <br />12 <br />250,000 <br />reclamation <br />�# iAfit £tlliCtlrfiii <br />;s <br />; % „12 <br />; % %ia <br />Reclaim final disturbance. <br />6 <br />Total <br />141 <br />2,700,000 <br />3. Revegetation Plan <br />For both the dryland and new wetland areas, the soil will be disced to loosen the soil. Due to the mild <br />grade, seed can be drilled in both areas in order to ensure a better revegetation success rate. The <br />dryland areas will be seeded with a specially designed seed mix, seen below in Table E-3. Certified <br />weed free mulch will be crimped into the surface at 2000 Ibs per acre. The 6HAV slopes along the <br />north and west sides of the pit will be hydroseeded only. The new wetlands will be seeded with a <br />specially designed mix, seen below in Table E-4. Fertilizer may be added as determined by a soil test <br />at the time of seeding but will only be used in the areas outside of the wetland footprints. Heavy <br />furrows will be left in the tilled topsoil to provide moisture concentration and shade areas in order to <br />promote better conditions for successful vegetation establishment. Seeding will take place the fall <br />after which a slope has been retopsoiled. Slopes will be regraded, backfilled, and retopsoiled as soon <br />as they are able to be reclaimed, the exception being wetland footprint areas, which will only be <br />White River City E-3 Lewicki & Associates <br />July 222 <br />