2. Reclamation Timetable
<br />The time for reclamation is shown below. Exhibit L: Reclamation Costs describes the worst -case
<br />bond scenario.
<br />Table E-3 Reclamation Timetable
<br />Description
<br />Time to complete•
<br />Mining
<br />12
<br />250,000
<br />12
<br />redamatior,
<br />Mining with concurrent
<br />12
<br />250,006
<br />reclamation
<br />AAini wieh c urrent 7t,
<br />;- ' ,,,, " , ,,, `;,,,,, ,; ,;,,, 12
<br />M tom
<br />„ . ,, ,,,; .,,,
<br />Mining with concurrent 12
<br />250,000
<br />reclamation
<br />Mini witty+ ttrrerft
<br />1-7 ;,: ,,; „ , „ , ., 12,
<br />,;
<br />2SO,000
<br />Mining with concurrent 12
<br />250,000
<br />reclamation
<br />12
<br />Mining with concurrent
<br />12
<br />250,000
<br />reclamation
<br />�# iAfit £tlliCtlrfiii
<br />;s
<br />; % „12
<br />; % %ia
<br />Reclaim final disturbance.
<br />6
<br />Total
<br />141
<br />2,700,000
<br />3. Revegetation Plan
<br />For both the dryland and new wetland areas, the soil will be disced to loosen the soil. Due to the mild
<br />grade, seed can be drilled in both areas in order to ensure a better revegetation success rate. The
<br />dryland areas will be seeded with a specially designed seed mix, seen below in Table E-3. Certified
<br />weed free mulch will be crimped into the surface at 2000 Ibs per acre. The 6HAV slopes along the
<br />north and west sides of the pit will be hydroseeded only. The new wetlands will be seeded with a
<br />specially designed mix, seen below in Table E-4. Fertilizer may be added as determined by a soil test
<br />at the time of seeding but will only be used in the areas outside of the wetland footprints. Heavy
<br />furrows will be left in the tilled topsoil to provide moisture concentration and shade areas in order to
<br />promote better conditions for successful vegetation establishment. Seeding will take place the fall
<br />after which a slope has been retopsoiled. Slopes will be regraded, backfilled, and retopsoiled as soon
<br />as they are able to be reclaimed, the exception being wetland footprint areas, which will only be
<br />White River City E-3 Lewicki & Associates