Laserfiche WebLink
Battle Mountain Resources,Inc—EA Times Series Second Quarter 2022 <br /> 2 1600 <br /> 800 <br /> 0 1400 <br /> J <br /> E1200 <br /> 600 8 <br /> b ? 1000 <br /> E o <br /> 6- 600 <br /> w 400 G > <br /> 00 0 <br /> 600 <br /> � 4 A <br /> 200 5 400 <br /> 0 <br /> 2 I <br /> 200 <br /> 0 0 0 <br /> 14 0 1 <br /> 12 <br /> 8 Non-detect reported.Analyred by <br /> 10 <br /> method%ith high reporting limit. <br /> J 01 <br /> 6 <br /> 8 E E <br /> E <br /> o <br /> 6 0 4 a <br /> 1� U 001 <br /> 4 <br /> 2 <br /> 0 A 0 <br /> 0001 <br /> ano s s <br /> 12 <br /> on so 10 <br /> v <br /> ]5 n <br /> 2110 c <br /> aG )0 6 <br /> 100 ° <br /> 65 <br /> 2 <br /> o no <br /> �l o <br /> PROJECT <br /> 101-05 03 PREPARED FOR <br /> PREPARED BY. TIME-SERIES PLOTS FOR MONITORING WELL BF-4 <br /> 2nd Quarter 2022 -- <br /> SAN LUIS PROJECT <br />