My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-28_HYDROLOGY - M2008017
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2008017
>
2022-07-28_HYDROLOGY - M2008017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 2:51:08 PM
Creation date
7/28/2022 2:50:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
Hydrology
Doc Date
7/28/2022
Doc Name Note
Water Level Monitoring 7/22
Doc Name
Water Level Monitoring
From
Broken Arrow
To
DRMS
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Broken Arrow <br />Investments, LLC <br />801 8th Street, Suite 130 <br />Greeley, CO 80631 <br /> <br /> <br />July 28, 2022 <br /> <br /> <br />Mr. Eric Scott <br />Environmental Protection Specialist <br />State of Colorado <br />Division of Reclamation, Mining, & Safety <br />1313 Sherman Street – Room 215 <br />Denver, CO 80203 <br /> <br />RE: Broken Arrow Investments, LLC – File No. M-2008-017 Derr Pit – Summary for July Water <br />Level Reporting <br /> <br /> <br />Dear Mr. Scott, <br /> <br />Broken Arrow Investments, LLC is providing this summary letter to discuss and provide information <br />in regard to the July off-site an on-site monitor wells and provide the dewatering volumes pumped <br />for June. <br /> <br />During the month of June a total of 0.0 acre-feet was pumped and discharged into the on-site <br />recharge ponds within the Derr Pit. <br /> <br />AgPro was able to get the normal monthly readings/measurements on all of the off-site wells for the <br />July readings except for the Hofner #2 irrigation well, Koehler irrigation well, and Bliss irrigation well <br />as these wells were operating. As discussed in our technical revision letter there are some on-site <br />wells that were removed due to the slurry wall construction and those wells are no longer in place. <br />Monitor Well 11 is no longer accessible and neither is Monitor Well 1. Some of the on-site monitor <br />wells saw a and increase and some saw a decrease in the elevation of the water levels. The water <br />level elevations in the monitor wells on the Phase 1-4 portion of the pit went down on the south side <br />by 0.47 feet and up by 0.06 on the north side. The water level elevations in the monitor wells on the <br />upper terrace of the permit area increased by 0.68 feet for MW-14, increased by 0.02 feet for MW- <br />15, decreased by 0.81 feet for MW-16, no reading was completed for MW-17 as it was damaged <br />and will be repaired, and decreased by 0.28 feet for MW-18. <br /> <br /> <br />Please give me a call at (970) 566-5090 or send an e-mail to discuss further. <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br /> <br />Kelly Hodge <br />Broken Arrow Investments, LLC
The URL can be used to link to this page
Your browser does not support the video tag.