Laserfiche WebLink
Black Obsidian Pit .. <br /> Colorado Quarries Inc. <br /> Permit M-1987-026, 112c Conversion <br /> Exhibit C- Mining Plan Map, Showing <br /> __. 3 Segments of Pit Development,for <br /> Concurrent Reclamation <br /> ry� ga <br /> Green line- Proposed 112c boundary �. <br /> Thin black line-Affected area boundary <br /> Orange lines (in pit)-Mining segments, <br /> numbered 1,2, and 3 ` ' ` 10*� <br /> White arrows- Direction of mining <br /> a <br /> Double white lines-Access and onsite <br /> roads(proposed) <br /> Blue lines- Ephemeral drainages <br /> Blue areas- Sed ponds r <br /> Bright green lines- Sed control structures <br /> Thick black line-Upper limit obsidian deposit <br /> Purple line-Top of overburden slope <br /> (above obsidian deposit) , <br /> Orange area-Operations pad(Op Pad) <br /> Red area- Processing pad (Proc) f r <br /> Magenta area-Topsoil storage (TS) `� R <br /> Light green area- Overburden storage(OB) <br /> Yellow areas- Pit benches(conceptual) <br /> � Tan areas- BLM-managed land 'i'- - <br /> Yellow lines- Overhead powerlines,on north <br /> side(Owned by Sangre de Cristo Elec Coop) <br /> Map prepared by Bob Oswald <br /> High Count Co suiting Services LLC <br /> 7/15/22 � <br /> s <br /> Legend 0 0 o . o <br />