RULE 4 PERFORMANCE STANDARDS <br /> <br />Collom – Rule 4, Page 5 Revision Date: 6/20/22 <br /> Revision No.: MR-242 <br />Collom Pit area, as needed for mine operations (please see Exhibit 7, Item 23, Part A) . A system of <br />clean water diversion ditches upslope from the mining activities will be constructed to divert surface <br />runoff away from the disturbed areas (Collom Pit). These temporary diversions will be constructed to <br />pass at a minimum the runoff from the precipitation event with a two-year recurrence interval. <br /> <br />Any topsoil stockpile areas that may be constructed outside the confines of engineered sediment control <br />structures will be required to have a perimeter ditch and berm constructed around the entire footprint of <br />the stockpile sufficient to capture and retain any rainwater/snowmelt that may be generated from the <br />stockpile area to preclude loss and/or contamination of the topsoil resource. A demonstration of the <br />effectiveness of sediment control structures to be constructed around several topsoil stockpiles planned <br />outside of primary sediment control may be found under Exhibit 7, Item 23, Part D. <br /> <br />4.05.4 Stream Channel Diversions (Relocation of Streams) <br /> <br />The drainage and sediment control measures described under Section 2.05.6 and presented in the Erosion <br />and Sedimentation Control Plan (Exhibit 7, Item 23) will provide for temporary diversion of surface <br />drainages within the permit area, as needed for mine operations. A system of temporary ditches will be <br />used to divert runoff from disturbed areas to sediment ponds. The natural drainage systems will be <br />restored to historic drainage patterns once diversion ditches are removed; therefore, there will be no <br />permanent diversions of these channels. <br /> <br />The only stream channel that will be impacted by the Collom Pit is the main stream of Little Collom <br />Gulch, an ephemeral stream draining less than one square mile at the upstream pit boundary. Clean water <br />diversions will be installed above the Collom Pit (Exhibit 7, Item 23, Part A) and will be removed as <br />mining progresses. It will also be channelized further downstream, alongside the haul road leading from <br />the Collom Pit to the spoil pile, where it drains greater than one square mile (Exhibit 7, Item 2, Part B). <br /> <br />4.05.5 Sediment Control Measures <br /> <br />Sediment control measures to be implemented are shown in Exhibit 7, Item 23 Erosion and Sedimentation <br />Control Plan, and postmining channels are shown on Map 41B. These facilities, consisting primarily of <br />diversion ditches and sedimentation ponds, will be located, constructed and maintained to avoid erosion <br />and increased contribution of sediment load to runoff. <br /> <br />Facilities to control sediment are typically installed in areas above and/or below the planned sites of <br />disturbance. “Upstream” facilities, such as clean water diversion ditches upslope from the mining <br />activities, serve to divert runoff away from the disturbed areas. Temporary diversion ditches below the <br />disturbed area of the pit will help collect runoff from disturbed areas and route it into the sedimentation <br />ponds. During active mining, the mining areas will aid in retaining sediment within the disturbed areas <br />by catching water in pits, small depressions and dozer basins, etc. Once reclaimed, the basins will drain <br />as they did prior to mining activities (i.e., historic drainage patterns will be re-established). <br /> <br />All temporary diversions will be removed and reclaimed when no longer needed for sediment control in <br />accordance with Rule 4.05.2(2) <br /> <br />Channel lining rock riprap and energy dissipaters will be used when necessary. As stated above, all <br />temporary diversion structures will be seeded and revegetated after removal. Colowyo does not anticipate <br />that there will be any significant excess material resulting from the construction of diversion ditches. <br /> <br />None of the diversions will drain into underground mines. <br />