My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-22_REVISION - M2010071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2022-07-22_REVISION - M2010071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2022 3:07:01 PM
Creation date
7/22/2022 3:00:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
Revision
Doc Date
7/22/2022
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response
From
City of Lafayette
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.5 Exhibit E – Reclamation Plan <br /> <br />(a) Description of the Type of Reclamation <br />The site will be reclaimed to developed water resource and will construct three <br />additional water storage reservoirs Reservoir #2, Reservoir #4, and Reservoir <br />#2A which correspond to Cells 2, 4 and 2A respectively. Reservoir #2 shall have <br />a normal pool water surface area of approximately 32 acres. Reservoir #4 will <br />have a normal pool water surface area of approximately 24 acres. Reservoir 2A <br />will have a normal pool water surface area of 38.3 acres. Both reservoirs #2 and <br />#4 will be constructed with a compacted clay liner around the perimeter of the <br />mining highwall as shown in Figure 6.4.5 – 1 Typical Section, and Exhibit F, <br />Sheets 1-4. Reservoir 2A will be constructed with an embankment dam along the <br />north, east and west sides as shown in Exhibit F AM-2 Sheets 1 and 2. Detailed <br />engineering plans for the embankment dam have been submitted to the Office of <br />the State Engineer along with the application form. These documents are given <br />in Attachment A. The south portion of the perimeter of Cell 2A which is not part of <br />the embankment dam will be reclaimed by constructing a compacted clay liner to <br />the same specifications as Cells 2, and 4. Finally, a grass lined stormwater <br />diversion swale will be constructed around the perimeter of reservoir 2A to divert <br />stormwater from entering the Cell 2A reservoir. The design of the swale is given <br />in Exhibit E Attachment B Goose Haven Reservoir Complex Expansion Project <br />Cell 2A Hydrology Report. <br />Reclamation Earthwork/Compacted Clay Liner Construction <br />A summary table of reclamation earthwork volumes, areas and lengths is given <br />as Table 6.4.5-1. <br />Table 6.4.5-1. Reclamation Earthwork Summary <br />CELL 2 30-45ft deep <br />ITEM VOLUMES LENGTH AREAS <br /> <br />Total Embankment 163,040.00 yd3 <br /> <br />Clay Liner 90,507.25 yd3 <br /> <br />Slope fill 76,550.00 yd3 <br /> <br />Keyway Volume 4017.25 yd3 <br /> <br />Keyway Length 4338.63 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.