My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-22_REVISION - M2010071
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2022-07-22_REVISION - M2010071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2022 3:07:01 PM
Creation date
7/22/2022 3:00:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
Revision
Doc Date
7/22/2022
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response
From
City of Lafayette
To
DRMS
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TH-5 4 24 13.6 121 44 25 91 <br />TH-5 4 29 12.7 123 39 22 93 6X10-8 <br />TH-9 4 24 11.9 121 41 23 77 <br />TH-11 2 19 10 119 33 18 91 <br />TH-11 2 29 9.3 107 35 20 94 <br />TH-14 2 49 12.4 ND 38 24 64 <br />TH-16 2 29 9.6 130 40 28 98 <br />TH-19 2 31-34 20.3 ND 36 21 58.9 <br /> <br />Compacted Clay Liner Quality Assurance/Quality Control Plan <br /> <br />Please see Attachment 6.4.5 – 1 <br /> <br />Following construction of the compacted clay liner final construction report and <br />certification for the pit liner shall be completed and submitted to the Division. <br /> <br />The operator shall commit to no modifications to the design specifications without <br />prior Division approval. <br />(b) Post Mining Land Use Comparison <br />The site is currently used as a developed water resource facility and is consistent <br />with the Town of Lafayette’s master plan. Other land uses surrounding the site <br />include rural residential and agricultural and Boulder County Conservation <br />easements. The Goose Haven reservoir site is compatible with those land uses. <br />(c) Description of How the Reclamation Plan will Meet the Requirements of Section 3.1 <br />Completion of the reclamation plan described herein shall meet the requirements <br />of Section 3.1 <br />(d) Topsoil Segregation <br />Topsoil shall be segregated as shown in Exhibit D Sheet-2. <br />(e) Reclamation Sequence and Timetable <br />An estimate of the sequence and periods of time for each reclamation activity is <br />given in Table 6.4.5-1. <br />Table 6.4.5-1. Reclamation Sequence Summary <br />Mining Cell / Size Reclamation Activity Approximate Time Period <br />Cell 2 / 35 acres Construct Compacted Clay <br />Liner and Construct <br />Appurtenant Pipeworks <br />Following Mining of Cell 2 <br />Cell 2 / 35 acres Perform Topsoiling / Following Construction of
The URL can be used to link to this page
Your browser does not support the video tag.