My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-07-19_REVISION - M1987026 (31)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987026
>
2022-07-19_REVISION - M1987026 (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2025 6:28:09 AM
Creation date
7/19/2022 3:22:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987026
IBM Index Class Name
Revision
Doc Date
7/19/2022
Doc Name Note
BLM Environmental Assessment
Doc Name
Adequacy Review Response #3
From
Colorado Quarries Inc
To
DRMS
Type & Sequence
CN1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-FO20-2020-0036 EA <br /> -6- <br /> Exhibit D - Reclamation Plan (continued) <br /> 2. Specify the maximum gradient of reclaimed slopes (horizontal vertical). <br /> We recommend 3:1 or gentler for purposes of stability and revegetation <br /> establishment. If you propose steeper slopes you should include a <br /> justification that supports the proposed post-mining land use and demonstrates <br /> compliance with the applicable performance standards of Rule 6. <br /> 3. Specify the thickness of topsoil to be replaced. We recommend using at <br /> least 12 inches of topsoil material to enhance root penetration and hasten <br /> revegetation. <br /> 4. Specify when the site will be seeded - late fall or early spring. Note <br /> how the seedbed will be prepared to eliminate compacted conditions (e.g., <br /> plowed, chiseled, disced). Note whether fertilizer will be utilized. and if <br /> it will, then note the type of fertilizer, application rate and how it will be <br /> incorporated into the soil. <br /> S. Specify the grass, forb, shrub and tree species to be planted and the <br /> applicable quantities. Specify the quantity of each grass and forb species as <br /> pounds of pure live seed per acre and the number of each species of shrubs and <br /> trees per acre. <br /> 6. Specify the application method for grass and forb seeding. If the seed is <br /> to be broadcast, the application rate should be twice the rate required for <br /> seed drilling, and the seed should be raked or harrowed after application. <br /> 7. Specify the kind of mulch to be used and rate of application. <br /> 8. Specify any ponds, streams, roads and buildings that will-remain after <br /> reclamation, These features must be shown on the Exhibit E - Map. If ponds <br /> are part of the reclamation plan, the slopes can not be steeper than 2:1, <br /> except from 5 feet above to 10 feet below the expected waterline where slopes <br /> can not be steeper than 3:1. Where wildlife habitat is the proposed future <br /> land use, shore lines should be irregularly shaped to promote a diverse - <br /> wildlife habitat. <br /> 9. Specify the reclamation treatment of any waste rock dumps, tailing <br /> impoundments, underground mine openings. buildings and other features <br /> specified in your mine plan but not previously addressed in the reclamation <br /> plan narrative. This should describe the measures taken to minimize <br /> disturbance to the hydrologic balance. prevent off-site effects, and provide <br /> for a stable configuration consistent with the proposed future land use. <br /> 10. The maximum amount of financial warranty for a Limited Impact Operation is <br /> S5000.00.* If you wish to commit to a $5,000.00 financial warranty, then you <br /> do not need to provide an estimate of reclamation costs. if you want to post <br /> a nancial warranty in a lesser amount, then you must provide an estimate of <br /> the actual costs to reclaim the site based on what it wouid'cost an <br /> independent contractor to complete reclamation including unit costs for the <br /> following activities as appropriate to the operation: backfilling, grading, <br /> topsoil application, seeding, mulching. fertilization, and labor. <br /> * The Board will assess a financial warranty not to exceed $15,000.00 for aqy <br /> mining operation which uses cyanide compounds in a leaching process. <br /> A-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.