Laserfiche WebLink
Bureau of Land Management Appendices <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> e. Schedule- <br /> Seasonal and daily 40 hours per week,November through April <br /> hours of operation N N - <br /> and shifts 50 hours per week, May through October <br /> 2. Mine Site <br /> Expected life of Phase I expansion is +/-25 <br /> ears <br /> a. Mine method Possible additional phases could extend another <br /> and direction 25 years Y N N - <br /> Mine is open pit. Expansion will begin in <br /> existing mine and expand in all directions. Mine <br /> will be deeper. reference maps) <br /> Expanded pit is 1000' x 510' (dimensions at the <br /> b. Facilities top of the highwall).Depth will be as much as <br /> (buildings, scales, 200 feet,though average depth will be 140 feet. <br /> wash areas, (Depth varies from 40' near pad to 200' at NE <br /> hazardous highwall). The operator has established the Y N <br /> materials, storage, proposed dimensions of the expanded pit, based N <br /> tank farms, on extent and depth of deposit.All facilities and <br /> restrooms, structures will be on either the new processing <br /> smoking area, etc.) area or storage pad located on private lands <br /> reference Figure 3 in EA <br /> Structures Types-buildings, storage,tanks, <br /> sanitary,etc. (bldgs., scales, wash areas, <br /> hazardous materials storage, fuel,restrooms, <br /> c. Man-made smoking, etc.). Operator may add a modular <br /> structures office/dry room or install metal building on the Y N N <br /> (culverts, bridges, pad. All facilities and structures to be in a safe <br /> portals,etc.) location,on or near the pad area.All facilities <br /> and structures will be on either the new <br /> processing area or storage pad located on private <br /> lands ref. figure 3 in EA <br /> A-2 <br />