Laserfiche WebLink
Bureau of Land Management Environmental Assessment <br /> Royal Gorge Field Office DOI-BLM-CO-F020-2020-0036 EA <br /> Brought Considered, <br /> Program area Issue statement(question) forward but further Resource <br /> No Reason there is no issue or that <br /> w/impact-causing element analysis specialist Date <br /> (in alphabetic order) for deemed issue further analysis is unnecessary name <br /> analysis <br /> unnecessary <br /> adjacent to the project area.The <br /> expansion of the mining activity would <br /> introduce some changes to the visual <br /> landscape that are consistent with <br /> current conditions. <br /> It is assumed that conditions <br /> associated with the proposed project <br /> site are currently clean and that no <br /> contamination is evident at the current <br /> operations.No hazardous material,as <br /> defined by 42 U.S.C.9601 (which <br /> includes materials regulated under <br /> CERCLA,RCRA and the Atomic <br /> Energy Act,but does not include <br /> petroleum or natural gas),will be used, <br /> produced,transported,or stored during <br /> Would the proposed action project implementation. Since the <br /> Wastes,Hazardous or cause the accumulation of proposed action will not involve use of <br /> Solid waste,hazardous or solid X materials that would result in A.Sanderson 10/01/2020 <br /> materials? generation of solid and/or hazardous <br /> wastes and all POLs and waste will be <br /> stored on private lands,further <br /> analysis is deemed unnecessary.PDF: <br /> This project involves some type of <br /> oil or fuel use,transfer and/or <br /> storage,an adequate spill kit is <br /> required to be onsite.The project <br /> proponent will be responsible for <br /> adhering to all applicable local, <br /> State and Federal regulations in the <br /> event of a spill,which includes <br /> 35 <br />